Los Angeles decks fail in three different ways, and we see all three every week. In the hills, from Sherman Oaks and Studio City to the Hollywood Hills, Encino and Woodland Hills, it is post-supported and cantilevered decks where water runs toward the house, the ledger takes the damage, and materials go down the slope by hand.
On the flats of the Valley, from Van Nuys and Valley Glen to Reseda, Northridge and North Hollywood, and across Burbank, Glendale and the Westside, the decks and balconies are flat: water sits in the low corner, the coating gives up at a seam, and the plywood beneath goes soft over a few winters.
And on the apartment and condominium buildings along every boulevard: shared walkways, open stairs and stacked balconies that stay in use while we repair them, and the elements SB 721 and SB 326 now require inspected. Those are the jobs that most often come to us with a report attached.
Either way we open it up before we price it. A re-coat over sound, dry framing is a small job. A re-coat over wet framing is the same job done twice, and the second time costs more.