ADU Construction · Los Angeles

Los Angeles
ADU Construction
Build Your Backyard.

Detached ADUs, garage conversions, JADUs, and attached units — design through Certificate of Occupancy, every permit managed.

Professional, licensed & insuredFixed-price proposalsPermits pulled & closedOur own crew, not subs

Get a Free Estimate

Tell us about the project. We call back to schedule the on-site estimate.

✓
Request Received
Thank you — a senior member of our team will reach out within 4 business hours. For anything urgent, call (818) 210-4544.

Your information is kept private and never shared. Privacy Policy

By submitting, you agree that Right Image Builders may contact you by phone, text or email about your project, including by automated means. Consent is not a condition of purchase. Message and data rates may apply. See our Privacy Policy and SMS Terms.

5.0★Google · 45 reviews
57+Permitted projects
12+Years experience · CSLB #1021284
FreeOn-site estimate · fixed written price

ADU builder in Los Angeles: Right Image Builders (CSLB #1021284) designs, permits and builds garage conversions, detached ADUs and junior ADUs across the San Fernando Valley, Burbank and Glendale under one contract — plans, Title 24, LADBS or city plan check, utilities, construction and the Certificate of Occupancy. Plan on 5–8 months for a conversion and 9–14 months for a detached unit; one fixed written price after a free feasibility visit.

Licensed general contractor, CSLB #1021284, licensed since 2016, 5.0★ Google (45 reviews), 4.9★ Angi (103 reviews). Planning ranges by tier and neighborhood are in the ADU cost guide.

Updated October 2026 · Right Image Builders project team · CSLB #1021284 · 5.0★ Google (45 reviews) · 4.9★ Angi (103 reviews)

The Right Image Approach

A Second Unit
Built to Perform

California's ADU law has changed dramatically since 2020. Senate Bills 9 and SB 897, Assembly Bill 68, and a series of LADBS ordinance updates have made it significantly easier — and faster — to build an ADU on most Los Angeles residential lots. Reduced setbacks (now 4 feet on rear and sides for detached ADUs), streamlined plan check timelines, and the elimination of owner-occupancy requirements have opened the door for thousands of LA homeowners who couldn't have built an ADU under the old rules.

Right Image Builders manages the entire ADU process under one contract. We coordinate architectural design (you don't need to hire a separate architect), handle all permit submittals and plan check responses with LADBS or your city's building department, pull all trade permits (structural, mechanical, electrical, plumbing), build the unit with our in-house team, and manage the Certificate of Occupancy process. You don't manage a designer-contractor split or explain the permit corrections to two different parties.

We build every ADU type: detached accessory dwelling units (DADUs) on the back of single-family lots; attached ADUs that expand the existing structure; Junior ADUs (JADUs) that convert a bedroom, bonus room, or portion of a garage within the existing building envelope; and full garage conversions. Each type has different permitting requirements, setback rules, and utility implications — we assess all of it at the site visit before you commit to anything.

For families looking at multi-generational living, it creates a dignified, independent space without losing the connection of a shared property. We've built ADUs across Valley Glen, Encino, Burbank, Pasadena, and dozens of other LA communities — and we know the local permit landscape better than most.

Request Free ADU Consultation
ADU construction Los Angeles — Right Image Builders
ADU project · Valley Glen, CA
ADU Types We Build

Choose Your
Unit Type

01

Detached ADU

Up to 1,200 sq ft

A completely separate new structure built on the same lot as the primary residence. Up to 1,200 sq ft. Requires new foundation, separate utilities, and full permit. Maximum flexibility in design and layout.

02

Attached ADU

Connected to primary

An addition to the existing home footprint — sharing at least one wall with the primary structure. Efficient use of existing utility connections. Up to 50% of primary dwelling area or 1,200 sq ft, whichever is less.

03

Junior ADU (JADU)

Up to 500 sq ft

A conversion of an existing bedroom, bonus room, or space within the primary home's existing walls. Up to 500 sq ft. Requires an efficiency kitchen and separate entrance. Fastest and most affordable path to a legal unit.

04

Garage Conversion

Existing structure

Converting an existing attached or detached garage into a permitted living unit. Requires insulation, interior finishing, egress windows, full MEP rough-in, and a permit. Most cost-effective ADU path when the structure is sound.

How we work with you

Transparent from the first visit to the closed permit.

Professional, licensed and insured, and we put that in writing at every step, because a remodel is a trust decision before it is a construction decision.

Licensed and insured, verifiable

California general contractor license CSLB #1021284 (General Building B), active since 2016, with general liability and workers' compensation insurance. Check the license yourself at cslb.ca.gov before you sign anything, with us or anyone else.

A written scope before a dollar changes hands

The proposal lists what is demolished, what is built, which finishes are included and which permit covers it. If it is not written down, it is not in the job.

Photos of what we find, before we continue

When walls, floors or roofs open up we photograph what is behind them and send you the pictures. Anything beyond the scope is priced in writing before the crew continues. You never find out from the invoice.

The deposit rule, in your favor

California law caps a home-improvement deposit at $1,000 or 10 percent of the contract, whichever is less. We follow it. Progress payments follow the work, and the final payment comes after your walkthrough.

Permits pulled and closed in your name

We submit the plans, meet the inspector and close the permit. You get the closed-permit record, which is what a buyer, an insurer or an appraiser will ask for.

One licensed crew, one phone number

The people who estimate the job are the people who build it. No subcontractor hand-offs, no call center; your project lead answers the phone during the job and after it.

Our Full Scope

Design to CO,
Under One Contract

01

Site Analysis & ADU Feasibility

Before any design work begins, we assess your property for ADU viability: lot size and coverage allowance, existing setbacks, utility capacity (sewer, water, electrical panel amperage), SB 9 and JADU applicability, and any HOA or deed restrictions. You'll know exactly what you can build, how large it can be, and what it will realistically cost before committing to design.

02

Architectural & Structural Design

We coordinate licensed architectural drawings — site plan, floor plan, elevations, sections, and all LADBS-required details. Structural drawings and calculations for foundation, framing, and lateral systems. Title 24 energy compliance documentation. All of this is coordinated under our engagement; you're not managing a separate architect-contractor handoff.

03

Permit & LADBS Coordination

ADU permit submittals, plan check responses, and correction rounds with LADBS or your city's building department. We know the ADU-specific ministerial ADU review, which approves a code-compliant ADU without a public hearing, and the LADBS Pre-Approved ADU Standard Plans program. Trade permits (structural, mechanical, electrical, plumbing) are pulled and managed under our license. You never visit the permit counter.

04

Full Construction — Foundation to Finish

Site preparation and foundation (slab, grade beam, or raised), framing, roofing and exterior waterproofing, windows and exterior doors, insulation, drywall, flooring, kitchen and bath finishes, interior doors and trim, paint, and all mechanical systems. One crew, one schedule. No subcontractor coordination left to you.

05

Utility Connections & Mechanical

New electrical service connection or panel subpanel feed, gas line extension or all-electric design, water supply and drain connection to the main sewer, and HVAC — typically ductless mini-split systems for ADUs. We coordinate with LADWP, SoCalGas, and the applicable water district for new service accounts where the ADU is to have its own utility meters.

06

Certificate of Occupancy

Final inspections for all trades — building, electrical, mechanical, plumbing — coordinated and scheduled by our team. Punch list items identified during final walk-through are addressed before we request final sign-off. We hand you a Certificate of Occupancy and a fully legal, permitted, rentable unit. No open permits, no uninspected work.

How We Price

No Surprise Invoices
in Los Angeles

An ADU in Los Angeles starts with a free on-site visit and ends with one fixed, written price that covers the whole scope, the permit from LADBS and the inspections, before any work begins.

The three things that change the price are the scope, what the house hides and the finishes you choose, and each is settled in writing before the crew moves on; final payment comes after your walkthrough.

If you want numbers before the visit, the ADU cost guide publishes the current planning ranges.

Recent Projects
How It Works

Three Steps.
Zero Surprises.

01

Free Site Consultation

A senior member of our team visits your property, assesses feasibility, reviews setbacks and utility capacity, and gives you an honest assessment of what ADU type makes sense and what it will realistically cost.

02

Design, Permit & Fixed Price

We coordinate architectural design, submit for permit, and deliver a fixed-price construction contract before a single shovel moves. No open-ended T&M contracts on an ADU project.

03

Build & Deliver Your CO

One crew builds your ADU from foundation to final inspection. We hand you the Certificate of Occupancy — a fully legal, rentable unit with zero open permits.

Reviews

What Clients Say About
Our ADU Construction Work

★★★★★

ADU build in Sherman Oaks. Permits pulled, inspections passed, project completed in 14 weeks. They were transparent about every step. We're renting the unit already — it's beautiful and fully up to code.

Michael & Diane G.
Detached ADU · Sherman Oaks
Google
★★★★★

We had a complex ADU project that other contractors kept turning down or quoting absurd prices. Right Image Builders handled permits, design, and construction seamlessly. This is the most professional contractor I've ever worked with in 15 years of owning property in LA.

Robert T.
ADU Construction · Sherman Oaks
Yelp
★★★★★

We had tried two other contractors who couldn't navigate the LADBS permit process for our ADU. Right Image Builders had the permit in hand within six weeks of starting design and delivered a beautiful unit on the exact date promised. It's now generating $2,800 a month in rental income. Best investment we've made in this property.

Marcus & Tricia L.
Detached ADU · Encino
Google
ADU Construction FAQ

Questions We
Hear Every Day

LADBS requires architectural drawings, a site plan, and Title 24 energy calculations for an ADU permit. Right Image Builders coordinates licensed architectural design as part of our scope — you don't hire an architect separately and then find a contractor to execute their drawings. We manage the design-through-permit process under one engagement, eliminating the architect-contractor handoff that causes most ADU project delays.
Under current California state law, detached ADUs in most LA jurisdictions require a minimum 4-foot setback from rear and side property lines. Front setbacks match the primary dwelling's setback. JADUs within the existing building envelope have no additional setback requirement. Rules vary by city — Beverly Hills, Pasadena, Santa Monica, and Burbank each have their own ADU ordinances that may differ from LADBS rules. We perform a site-specific feasibility analysis at the consultation.
Yes. California Government Code Section 65852.2 allows most single-family properties to have both a Junior ADU (up to 500 sq ft within the existing structure) and a detached ADU on the same lot. This means you could potentially add two additional legal rental units to a single-family property. Lot coverage, parking, and utility capacity are assessed at the site visit to confirm feasibility for your specific parcel.

A garage conversion or JADU takes 6–10 weeks of design and plan check and 3–5 months of construction, about 5–8 months in all. A detached ADU takes 3–5 months of design, engineering and plan check (the City reviews a complete ADU application ministerially, within 60 days under state law) and 6–9 months of construction, 9–14 months from the first visit to the Certificate of Occupancy. You get the milestone schedule with the fixed-price proposal.

Right Image Builders, a licensed general contractor (CSLB #1021284) based in Valley Glen, designs, permits and builds ADUs across Van Nuys, Sherman Oaks, Studio City, Encino, North Hollywood, Toluca Lake, Burbank, Tarzana, Valley Village and Woodland Hills under one fixed-price contract, with final payment only after your walkthrough. 5.0★ on Google (45 reviews) and 4.9★ on Angi (103 reviews).

Our Los Angeles Remodeling FAQ answers 75 questions, including ADU costs, state rules and timelines, with every cost figure tied to the page that owns it.

Three things: the scope you choose, the condition of the house once we open it up, and the finish level. Each is settled in writing, first in the fixed price after the free on-site visit, then in a written change order if a Los Angeles house hides something, so the number never moves without your signature; LADBS requirements are built in. Planning ranges by tier are in the ADU cost guide.

"

We had tried two other contractors who couldn't navigate the LADBS permit process for our ADU. Right Image Builders had the permit in hand within six weeks of starting design and delivered a beautiful unit on the exact date promised. It's now generating $2,800 a month in rental income. Best investment we've made in this property.

Marcus & Tricia L.
Detached ADU Construction · Encino, CA · Google Review ★★★★★
Your ADU, Next

Let's Build
Your Second Unit

Free on-site feasibility consultation. Design-to-CO under one contract. Fixed price before construction begins.

Free Estimate

Let’s Talk About
Your Project

Tell us what you are planning and a senior member of our team will get back to you within 4 business hours with next steps. No obligation, no sales pressure.

Prefer to talk it through?

(818) 210-4544