ADU Contractor · Woodland Hills, CA

ADU Builder & Contractor
in Woodland Hills, CA

Full-size detached ADUs up to 1,200 sq ft, garage conversions, and JADUs on the generous west-Valley lots of Woodland Hills — LADBS permits, Standard Plans, and heat-smart Title 24 design handled by one local team.

Woodland Hills ADU cost (2026): JADU $95K–$160K; Garage Conversion $140K–$210K; Detached ADU $260K–$450K+. Garage conversion or JADU: 6–10 weeks of design and plan check, then 3–5 months of construction, about 5–8 months in all. Detached ADU: 3–5 months of design, engineering and plan check, then 6–9 months of construction, 9–14 months to the Certificate of Occupancy.

Permits: LADBS, City of Los Angeles, with Baseline Hillside Ordinance review south of Ventura Boulevard. One fixed price after a free on-site estimate from a licensed general contractor, CSLB #1021284, based in Valley Glen about 25 minutes from Woodland Hills.

Updated October 2026 · Right Image Builders project team · CSLB #1021284 · 5.0★ Google (45 reviews) · 4.9★ Angi (103 reviews)

Right Image Builders is a licensed ADU contractor building across Woodland Hills — Walnut Acres, Vista de Oro, and the Warner Center edge, where generous lots make full-size units possible. We handle detached ADUs, garage conversions, and Junior ADUs, from design through LADBS permits, Standard Plans, and Title 24 energy compliance to final inspection. Licensed & insured, CSLB #1021284, a straight drive east in Valley Glen. Free on-site feasibility visit: (818) 210-4544.

The Right Image Approach

Room for a
Full-Size ADU

Woodland Hills is one of the better places in the San Fernando Valley to build an ADU, and the reason is simple: space. The larger ranch and traditional homes at the west end of the Valley sit on generous, suburban lots — the kind of yard that easily supports a full-size detached unit rather than a squeezed-in studio. Where a tight tract lot forces compromises, a Woodland Hills lot often has room for the whole 1,200 sq ft.

An ADU is a different animal from a remodel. In Woodland Hills an ADU is permitted through LADBS (City of Los Angeles) at the Van Nuys Development Services Center, 6262 Van Nuys Blvd, and power and water connections go through LADWP; the typical site is a Walnut Acres or Vista de Oro lot with room for a full 1,200 sq ft unit beside the pool, or a hillside parcel south of Ventura, which is what decides between a garage conversion, a JADU and a detached unit. That means the permitting and utility coordination matter as much as the construction. One contract covers design, LADBS, City of Los Angeles, with Baseline Hillside Ordinance review south of Ventura Boulevard and construction; the project lead who does your estimate at home runs the build, and the itemized fixed-price proposal follows within 3–5 business days.

The one thing you can't ignore here is the heat. Woodland Hills is among the hottest spots in Los Angeles in summer, so a detached ADU has to be built for that climate from day one: real insulation, a properly sized cooling system, and heat-smart low-E windows — which is also what Title 24 energy compliance requires. We design and document all of it rather than bolting it on later.

Whether you're building a detached unit for rental income, housing a family member, or adding a home office in the backyard, we'll tell you at the free site visit exactly what your Woodland Hills lot allows and what it realistically costs — before you spend a dollar on plans.

Request Free ADU Feasibility Visit
Detached ADU built by Right Image Builders
Representative detached ADU; Woodland Hills unit photos follow as each project completes.
What We Build

Three Paths
to a Second Unit

01

Detached ADUs

A ground-up standalone home in the backyard — up to 1,200 sq ft, with its own entrance and address. Woodland Hills' generous lots often support a full-size two or three-bedroom detached unit designed to complement the main home.

02

Garage Conversions

The most cost-effective path. We convert your existing detached or attached garage into a legal ADU — foundation and slab upgrades, framing, insulation, windows, a full kitchen and bath, and code electrical and plumbing, all permitted.

03

Junior ADUs (JADUs)

A JADU (up to 500 sq ft) carved out of the existing house — often a converted bedroom or garage-adjacent space with an efficiency kitchen. The lowest-cost way to add a legal, rentable unit without building new square footage.

04

Heat-Smart Title 24 Design

The Woodland Hills essential. We design in real insulation, a properly sized cooling system, and heat-smart low-E windows so the unit stays comfortable through west-Valley summers — and meets the Title 24 energy compliance the permit requires.

05

LADBS Standard Plans

Where it fits your lot, we use the City of LA's pre-approved ADU Standard Plan Program to shorten plan check and reduce design cost — a faster, more predictable path to permits than a fully custom set of drawings.

06

Design, Permits & Build

One contract from concept to keys: a licensed architect draws the plans, a structural engineer stamps them, we file with LADBS, and our own crew builds through final inspection and the Certificate of Occupancy.

Building in Woodland Hills

Why West-Valley Lots
Fit Full ADUs

The Woodland Hills advantage is the lot itself. Across Walnut Acres, Vista de Oro, and the family neighborhoods near the Warner Center edge, the larger ranch and traditional homes came with deep, generous yards — exactly the room a full-size detached ADU wants. It's the difference between shoehorning a studio into a corner and building a real two or three-bedroom second home.

Woodland Hills is City of Los Angeles, so your unit is permitted through LADBS. Where the lot fits, we use the city's pre-approved ADU Standard Plans to move plan check faster than a custom design would. And because these summers are brutal, every detached ADU here has to satisfy Title 24 energy standards — insulation, cooling, and heat-smart windows — which we design in from day one rather than treating as an afterthought.

Proximity to Warner Center is a quiet advantage, too: a well-built ADU in a suburban, family-oriented pocket minutes from one of the Valley's largest employment hubs is a strong rental and multigenerational-housing asset. From our Valley Glen shop, a straight drive east on the 101, we're close enough to stay hands-on through design, framing, and final inspection.

What It Costs

Woodland Hills ADU
Cost Ranges

ADU TypeTypical RangeWhat's Involved
JADU$95K–$160KUp to 500 sq ft carved from the existing home with an efficiency kitchen and bath. The lowest-cost legal unit.
Garage Conversion$140K–$210KConvert an existing garage to a full legal ADU — foundation/slab upgrades, framing, kitchen, bath, insulation, and code systems.
Detached ADU$260K–$450K+Ground-up standalone unit, often a full-size 800–1,200 sq ft build on a generous Woodland Hills lot, including utilities, site work, and Title 24 energy scope.

ADU costs vary widely with size, finishes, site conditions, and energy scope. Ranges are for planning only; your fixed-price proposal follows the free feasibility visit.

How It Works

Three Steps.
Zero Surprises.

01

Free Feasibility Visit

We visit your Woodland Hills property, confirm what your lot allows, check how much unit the yard supports, and tell you honestly which path — detached, garage conversion, or JADU — fits your goals and budget.

02

Design, Plans & Permits

We design the unit with heat-smart Title 24 detailing, use LADBS Standard Plans where they fit, and carry the submittal and corrections through plan check — with a fixed-price proposal set before construction.

03

Build & Deliver

One crew builds the ADU to final inspection sign-off, utilities connected and address issued. You get a rentable, legal, energy-efficient second home — final payment only after your walkthrough approval.

Free Feasibility Visit

Start Your Woodland Hills
ADU

Tell us about your lot and your goals and we'll get back to you within 4 business hours. We'll confirm what your property allows before you spend anything on plans.

Prefer to talk it through?

(818) 210-4544
✓
Request Received
Thank you — a senior member of our team will reach out within 4 business hours. For anything urgent, call (818) 210-4544.

Your information is kept private and never shared. Privacy Policy

Reviews

What Clients Say About
Our ADU Construction Work

★★★★★

ADU build in Sherman Oaks. Permits pulled, inspections passed, project completed in 14 weeks. They were transparent about every step. We're renting the unit already — it's beautiful and fully up to code.

Michael & Diane G.
Detached ADU · Sherman Oaks
Google
★★★★★

We had a complex ADU project that other contractors kept turning down or quoting absurd prices. Right Image Builders handled permits, design, and construction seamlessly. This is the most professional contractor I've ever worked with in 15 years of owning property in LA.

Robert T.
ADU Construction · Sherman Oaks
Yelp
★★★★★

We had tried two other contractors who couldn't navigate the LADBS permit process for our ADU. Right Image Builders had the permit in hand within six weeks of starting design and delivered a beautiful unit on the exact date promised. It's now generating $2,800 a month in rental income. Best investment we've made in this property.

Marcus & Tricia L.
Detached ADU · Encino
Google
Woodland Hills ADU FAQ

Questions We
Hear in Woodland Hills

Almost certainly. California ADU law lets nearly every single-family property add at least one ADU plus a Junior ADU, and Woodland Hills is especially well suited to it: the larger ranch and traditional homes here sit on generous lots at the west end of the Valley, which is exactly the room a full detached unit wants. We confirm exactly what your specific lot allows at the free site visit.
Under current California rules, a detached ADU can generally be built up to 1,200 sq ft, and a Junior ADU (JADU) is capped at 500 sq ft and must be within the existing home. Because Woodland Hills lots are generous, homeowners here often have the room for a full-size detached unit at or near the 1,200 sq ft limit — a genuine two or three-bedroom rather than a compact studio. We size the ADU to your lot, your budget, and whether you're housing family or renting.
Yes — Woodland Hills is City of Los Angeles, so your ADU is permitted through LADBS. We manage the whole process, and where it fits your lot we use the LADBS pre-approved Standard Plan Program to speed plan check. Because Woodland Hills summers are so hot, a detached ADU here also has to meet Title 24 energy standards — insulation, cooling, and heat-smart windows — which we design in and document from the start. You don't deal with the counter or the corrections — we do.
Yes, and it's one of the most cost-effective paths. Many Woodland Hills homes have a roomy detached or attached garage that converts well into a legal ADU — we upgrade the foundation and slab as needed, frame new walls, add insulation, windows, a full kitchen and bath, and bring electrical and plumbing to code, all on permit. Given the west-Valley heat, we pay particular attention to insulation and cooling so the converted space is comfortable year-round. A garage conversion typically costs less than a ground-up detached unit.
In Woodland Hills an ADU is permitted through LADBS (City of Los Angeles) at the Van Nuys Development Services Center, 6262 Van Nuys Blvd, and power and water connections go through LADWP; the typical site is a Walnut Acres or Vista de Oro lot with room for a full 1,200 sq ft unit beside the pool, or a hillside parcel south of Ventura, which is what decides between a garage conversion, a JADU and a detached unit. That means designing in real insulation, a properly sized cooling system, and heat-smart, low-E windows from day one, rather than treating them as upgrades. These measures are also required to meet Title 24 energy compliance on the permit. We build a Woodland Hills ADU to stay comfortable and efficient through triple-digit afternoons.

A garage conversion or JADU takes 6–10 weeks of design and plan check and 3–5 months of construction, about 5–8 months in all; a detached ADU takes 3–5 months of design, engineering and plan check and 6–9 months of construction, 9–14 months to the Certificate of Occupancy. Yes, you can rent it: a standard ADU can be rented long-term (30 days or more) with no owner-occupancy requirement; only a JADU requires the owner to live on the property.

Right Image Builders, a licensed general contractor (CSLB #1021284) based in Valley Glen about 25 minutes from Woodland Hills, designs, permits and builds ADUs across Walnut Acres, Vista de Oro, the Warner Center edge under one fixed-price contract: design, permits through LADBS, and construction by one crew, with final payment only after your walkthrough. 5.0★ on Google (45 reviews) and 4.9★ on Angi (103 reviews).

Ready When You Are

Let's Build Your
Woodland Hills ADU

Free feasibility visit. Fixed-price proposal. One local team from design and LADBS permits through to a finished, rentable, energy-efficient unit.

(818) 210-4544
✓
Request Received
Thank you — a senior member of our team will reach out within 4 business hours. For anything urgent, call (818) 210-4544.

Your information is kept private and never shared. Privacy Policy

CallFree Estimate