ADU build in Sherman Oaks. Permits pulled, inspections passed, project completed in 14 weeks. They were transparent about every step. We're renting the unit already — it's beautiful and fully up to code.

ADU Builder & Contractor in Glendale, CA
Garage conversions, detached ADUs and JADUs on Glendale lots — permits through the City of Glendale, design to Certificate of Occupancy, one fixed-price contract.
Glendale ADU cost (2026): JADU $95K–$160K; Garage Conversion $140K–$210K; Detached ADU $260K–$450K+. Garage conversion or JADU: 6–10 weeks of design and plan check, then 3–5 months of construction, about 5–8 months in all. Detached ADU: 3–5 months of design, engineering and plan check, then 6–9 months of construction, 9–14 months to the Certificate of Occupancy.
Permits: the City of Glendale Building & Safety Division, not LADBS. One fixed price after a free on-site estimate from a licensed general contractor, CSLB #1021284, based in Valley Glen about 20 minutes from Glendale.
Right Image Builders is a licensed ADU contractor building across Glendale — Rossmoyne, Adams Hill, the Verdugo Woodlands, Sparr Heights, Glenoaks Canyon and Chevy Chase Canyon. We handle garage conversions, detached ADUs and Junior ADUs from design through the City of Glendale permits to final inspection and the Certificate of Occupancy, on one fixed-price contract; our crew is based in Valley Glen about 20 minutes away. CSLB #1021284. Free feasibility visit: (818) 210-4544.
Glendale Lots
and the Second Unit They Can Hold
Glendale reviews ADUs under its own ordinance and through its own Building & Safety Division, ministerially like the rest of California, but with Glendale's zoning code, Glendale's hillside rules and Glendale Water & Power connections instead of LADBS and LADWP. The flat lots around Adams Hill, the Verdugo Woodlands and Sparr Heights are 6,000–9,000 sq ft with a detached garage, which converts to a 400–480 sq ft unit; the canyon lots in Glenoaks and Chevy Chase need the slope and the access designed first.
The typical site is a flat 6,000–9,000 sq ft R1 lot with a detached garage, or a canyon lot where slope and access decide the design. What decides between a garage conversion, a JADU and a detached unit is that lot, the sewer route and the main panel: 60- to 100-amp panels in the prewar and 1950s houses; a 200-amp Glendale Water & Power service upgrade is part of most full kitchens. Every unit gets a full kitchen and bath, its own sub-panel and, for a detached unit, its own address.
One contract covers the whole job: a licensed architect draws the plans, a structural engineer stamps them, we file with the City of Glendale and answer the corrections, and our own crew builds through final inspection and the Certificate of Occupancy. Our office is in Valley Glen, about 20 minutes away, and the project lead who does the feasibility visit runs the build.

Three Paths
to a Second Unit
Detached ADUs
A ground-up standalone home in the backyard — up to 1,200 sq ft, one or two bedrooms, its own entrance and address. On typical Glendale R1 lots we most often build in the 600–1,000 sq ft range, sized to the yard and your budget.
Garage Conversions
The most cost-effective Glendale path. We convert your existing detached or attached garage into a legal ADU — foundation and slab upgrades, framing, insulation, windows, a full kitchen and bath, and code electrical and plumbing, all permitted.
Junior ADUs (JADUs)
A JADU (up to 500 sq ft) carved out of the existing house — often a converted bedroom or garage-adjacent space with an efficiency kitchen. The lowest-cost way to add a legal, rentable unit without building new square footage.
City ADU Review
Glendale reviews ADUs ministerially under its own ordinance: a complete, code-compliant application is approved without a public hearing. We prepare the submittal to the city's own plan-check list, answer the corrections and schedule every inspection through the Certificate of Occupancy.
Utilities & Site Work
Water, sewer, and electrical connections; addressing; grading and drainage; and the exterior work that ties the ADU into the property. The unglamorous coordination that quietly makes or breaks an ADU timeline — handled in-house.
Design, Permits & Build
One contract from concept to keys: a licensed architect draws the plans, a structural engineer stamps them, we file with the City of Glendale, and our own crew builds through final inspection and the Certificate of Occupancy.
Why Glendale
Works for ADUs
Glendale is its own city, with its own Building & Safety Division, its own utility in Glendale Water & Power and its own zoning code, which is the first thing to know about remodeling there. The neighborhoods run from the flats around Brand Boulevard and Adams Hill up into Rossmoyne, the Verdugo Woodlands, Sparr Heights and the canyons of Glenoaks and Chevy Chase, with Metrolink at Glendale station on Cerritos Avenue and the Beeline buses across town. Our office is in Valley Glen, about 10 miles west by the 134, a 20-minute drive; the permit center is at 633 E. Broadway downtown.
No replacement parking is required when a garage converts, and the state exemption from impact fees for units under 750 sq ft applies in Glendale as everywhere else; what changes is the submittal: Glendale's own plan-check list, its hillside regulations on the foothill parcels and historic review where a lot sits inside a district overlay. We check the zoning on the city's parcel map, the panel, the sewer route and the overlay at the feasibility visit, and file at 633 E. Broadway.
An ADU in Glendale is permitted through the City of Glendale Building & Safety Division under ministerial review, which approves a code-compliant unit without a public hearing, and the utility connections go through Glendale Water & Power (GWP). Units under 750 sq ft pay no impact fees, a garage conversion needs no replacement parking, and the unit can be rented on leases of 30 days or more once the Certificate of Occupancy is issued.
Glendale ADU
Planning Ranges (2026)
| ADU Type | Typical Range | What's Involved |
|---|---|---|
| JADU | $95K–$160K | Up to 500 sq ft carved from the existing home with an efficiency kitchen and bath. The lowest-cost legal unit. |
| Garage Conversion | $140K–$210K | Convert an existing garage to a full legal ADU — foundation/slab upgrades, framing, kitchen, bath, and code systems. |
| Detached ADU | $260K–$450K+ | Ground-up standalone unit; hillside lots south of Ventura add grading, retaining, and access costs. |
Ranges are typical Glendale estimates for planning only and move with size, finish level, structural scope and site access; after the free on-site visit you get an itemized fixed price in writing.
Three Steps.
Zero Surprises.
Free Feasibility Visit
We visit your Glendale property, confirm what your R1 lot allows, check transit-parking rules, and tell you honestly which path — detached, garage conversion, or JADU — fits your goals and budget.
Design, Plans & Permits
We design the unit, prepare the submittal to the city's own plan-check list, and carry the submittal and corrections through plan check — with a fixed-price proposal set before construction.
Build & Deliver
One crew builds the ADU to final inspection sign-off, utilities connected and address issued. You get a rentable, legal second home — final payment only after your walkthrough approval.
Start Your Glendale
ADU
Tell us about your lot and your goals and we'll get back to you within 4 business hours. We'll confirm what your property allows before you spend anything on plans.
Prefer to talk it through?
(818) 210-4544What Clients Say About
Our ADU Construction Work
We had a complex ADU project that other contractors kept turning down or quoting absurd prices. Right Image Builders handled permits, design, and construction seamlessly. This is the most professional contractor I've ever worked with in 15 years of owning property in LA.
We had tried two other contractors who couldn't navigate the LADBS permit process for our ADU. Right Image Builders had the permit in hand within six weeks of starting design and delivered a beautiful unit on the exact date promised. It's now generating $2,800 a month in rental income. Best investment we've made in this property.
Questions We
Hear in Glendale
A garage conversion never needs replacement parking under state ADU law. A new detached unit needs no parking space when the lot is within half a mile walking distance of public transit, which covers much of Glendale near Metrolink at Glendale station on Cerritos Avenue and the Glendale Beeline. Where a space is required, one tandem space on the existing driveway satisfies it.
A garage conversion or JADU takes 6–10 weeks of design and plan check and 3–5 months of construction, about 5–8 months in all; a detached ADU takes 3–5 months of design, engineering and plan check and 6–9 months of construction, 9–14 months to the Certificate of Occupancy. Yes, you can rent it: a standard ADU can be rented long-term (30 days or more) with no owner-occupancy requirement; only a JADU requires the owner to live on the property.
Right Image Builders, a licensed general contractor (CSLB #1021284) based in Valley Glen about 20 minutes from Glendale, designs, permits and builds ADUs across Rossmoyne, Adams Hill, the Verdugo Woodlands under one fixed-price contract: design, permits through the City of Glendale, and construction by one crew, with final payment only after your walkthrough. 5.0★ on Google (45 reviews) and 4.9★ on Angi (103 reviews).
Kitchen Remodeling in Glendale
Open-plan conversions & full remodels →
Same CityBathroom Remodeling in Glendale
Tub-to-shower conversions & re-piping →
Same CityRoom Additions in Glendale
Rear additions, suites & second stories →
Service HubADU Construction — All of LA
Detached, garage conversion, JADU →
NearbyADU Builder in Burbank
Nearby neighborhood →
NearbyADU Builder in Toluca Lake
Nearby neighborhood →
Planning GuideADU Cost in Los Angeles
2026 planning ranges →
See Our WorkProject Portfolio
Recent projects across Los Angeles →
Planning GuideGarage Conversion vs. Detached ADU vs. JADU (2026)
Which ADU fits the lot →
Let's Build Your
Glendale ADU
Free feasibility visit. Fixed-price proposal. One local team from design and Glendale Building and Safety permits through to a finished, rentable unit.
(818) 210-4544
