ADU Contractor · Granada Hills, CA

ADU Builder & Contractor in Granada Hills, CA

Garage conversions, detached ADUs and JADUs on Granada Hills lots — permits through LADBS, design to Certificate of Occupancy, one fixed-price contract.

Professional, licensed & insuredFixed-price proposalsPermits pulled & closedOur own crew, not subs

Get a Free Estimate

Tell us about the project. We call back to schedule the on-site estimate in Granada Hills.

✓
Request Received
Thank you — a senior member of our team will reach out within 4 business hours. For anything urgent, call (818) 210-4544.

Your information is kept private and never shared. Privacy Policy

By submitting, you agree that Right Image Builders may contact you by phone, text or email about your project, including by automated means. Consent is not a condition of purchase. Message and data rates may apply. See our Privacy Policy and SMS Terms.

5.0★Google · 45 reviews
57+Permitted projects
12+Years experience · CSLB #1021284
FreeOn-site estimate · fixed written price

ADU Builder in Granada Hills, CA: Right Image Builders (CSLB #1021284) designs, permits and builds ADUs for 1950s–60s ranch homes, 1,500–2,200 sq ft on 7,000–10,000 sq ft lots, with parcels up to 20,000 sq ft in Old Granada Hills and hillside estate lots in Knollwood across Old Granada Hills along Chatsworth Street, the Knollwood hills north of Rinaldi and the tract streets around Balboa Boulevard, with its own crew and permits through LADBS, City of Los Angeles, with Baseline Hillside Ordinance review north of Rinaldi Street. Plan on 5–8 months for a garage conversion or JADU and 9–14 months for a detached unit, from the first visit to the Certificate of Occupancy. One fixed written price after a free on-site estimate.

Licensed general contractor, CSLB #1021284, licensed since 2016, 5.0★ Google (45 reviews), 4.9★ Angi (103 reviews). Office in Valley Glen, about 25 minutes from Granada Hills. Planning ranges by tier and neighborhood are in the ADU cost guide.

Updated October 2026 · Right Image Builders project team · CSLB #1021284 · 5.0★ Google (45 reviews) · 4.9★ Angi (103 reviews)

Right Image Builders is a licensed ADU contractor building across Granada Hills — Old Granada Hills along Chatsworth Street, the Knollwood hills north of Rinaldi, the tract streets around Balboa Boulevard and the blocks near Granada Hills Charter High School. We handle garage conversions, detached ADUs and Junior ADUs from design through LADBS permits to final inspection and the Certificate of Occupancy, on one fixed-price contract; our crew is based in Valley Glen about 25 minutes away. CSLB #1021284. Free feasibility visit: (818) 210-4544.

The Right Image Approach

Granada Hills Lots
and the Second Unit They Can Hold

Granada Hills lots are among the largest in the Valley for an ADU: 7,000–10,000 sq ft tracts around Balboa Boulevard with a detached garage, parcels up to 20,000 sq ft in Old Granada Hills, and RA and RE estate lots north of Rinaldi. The tract garages convert to a 400–480 sq ft unit; the larger lots take a full 1,200 sq ft detached unit, often with its own driveway approach, and the equestrian lots keep the setbacks that come with the zone.

The typical site is a 7,000–10,000 sq ft tract lot south of Rinaldi with a detached garage, or a Knollwood hillside parcel where slope and the Specific Plan set the design. What decides between a garage conversion, a JADU and a detached unit is that lot, the sewer route and the main panel: 100-amp panels in most 1950s–60s houses; a 200-amp LADWP upgrade is part of most full kitchens. Every unit gets a full kitchen and bath, its own sub-panel and, for a detached unit, its own address.

One contract covers the whole job: a licensed architect draws the plans, a structural engineer stamps them, we file with LADBS and answer the corrections, and our own crew builds through final inspection and the Certificate of Occupancy. Our office is in Valley Glen, about 25 minutes away, and the project lead who does the feasibility visit runs the build.

Request Free ADU Feasibility Visit
Detached ADU built by Right Image Builders
Representative detached ADU; Granada Hills unit photos follow as each project completes.
What We Build

Three Paths
to a Second Unit

01

Detached ADUs

A ground-up standalone home in the backyard — up to 1,200 sq ft, one or two bedrooms, its own entrance and address. On typical Granada Hills R1 lots we most often build in the 600–1,000 sq ft range, sized to the yard and your budget.

02

Garage Conversions

The most cost-effective Granada Hills path. We convert your existing detached or attached garage into a legal ADU — foundation and slab upgrades, framing, insulation, windows, a full kitchen and bath, and code electrical and plumbing, all permitted.

03

Junior ADUs (JADUs)

A JADU (up to 500 sq ft) carved out of the existing house — often a converted bedroom or garage-adjacent space with an efficiency kitchen. The lowest-cost way to add a legal, rentable unit without building new square footage.

04

LADBS Standard Plans

Where it fits your lot, we use the City of LA's pre-approved ADU Standard Plan Program to shorten plan check and reduce design cost — a faster, more predictable path to permits than a fully custom set of drawings.

05

Utilities & Site Work

Water, sewer, and electrical connections; addressing; grading and drainage; and the exterior work that ties the ADU into the property. The unglamorous coordination that quietly makes or breaks an ADU timeline — handled in-house.

06

Design, Permits & Build

One contract from concept to keys: a licensed architect draws the plans, a structural engineer stamps them, we file with LADBS, and our own crew builds through final inspection and the Certificate of Occupancy.

How we work with you

Transparent from the first visit to the closed permit.

Professional, licensed and insured, and we put that in writing at every step, because a remodel is a trust decision before it is a construction decision.

Licensed and insured, verifiable

California general contractor license CSLB #1021284 (General Building B), active since 2016, with general liability and workers' compensation insurance. Check the license yourself at cslb.ca.gov before you sign anything, with us or anyone else.

A written scope before a dollar changes hands

The proposal lists what is demolished, what is built, which finishes are included and which permit covers it. If it is not written down, it is not in the job.

Photos of what we find, before we continue

When walls, floors or roofs open up we photograph what is behind them and send you the pictures. Anything beyond the scope is priced in writing before the crew continues. You never find out from the invoice.

The deposit rule, in your favor

California law caps a home-improvement deposit at $1,000 or 10 percent of the contract, whichever is less. We follow it. Progress payments follow the work, and the final payment comes after your walkthrough.

Permits pulled and closed in your name

We submit the plans, meet the inspector and close the permit. You get the closed-permit record, which is what a buyer, an insurer or an appraiser will ask for.

One licensed crew, one phone number

The people who estimate the job are the people who build it. No subcontractor hand-offs, no call center; your project lead answers the phone during the job and after it.

Building in Granada Hills

Why Granada Hills
Works for ADUs

Granada Hills climbs from the flat tracts around Balboa Boulevard and Chatsworth Street up into Knollwood and the foothills north of Rinaldi, with Old Granada Hills and its walkable Chatsworth Street village on the west, Granada Hills Charter High School in the middle and O'Melveny Park, the city's second-largest park, at the top. Our office is in Valley Glen, about 14 miles south by the 405, a 25-minute drive, and the LADBS counter that reviews Granada Hills permits is the Van Nuys Development Services Center on Van Nuys Boulevard.

Two overlays shape the north side: the Granada Hills Specific Plan governs the estate and hillside parcels north of Rinaldi, and the Baseline Hillside Ordinance adds grading and access review on the slopes of Knollwood, so a detached unit there is designed around the pad and the driveway before anything else. South of Rinaldi the flats are straightforward LADBS review, and where the lot fits, the pre-approved Standard Plans shorten plan check. There is no rail transit in Granada Hills, so a new detached unit usually keeps its one parking space; we confirm that and the sewer route at the feasibility visit.

An ADU in Granada Hills is permitted through LADBS (City of Los Angeles) at the Van Nuys Development Services Center under ministerial review, which approves a code-compliant unit without a public hearing, and the utility connections go through LADWP. Units under 750 sq ft pay no impact fees, a garage conversion needs no replacement parking, and the unit can be rented on leases of 30 days or more once the Certificate of Occupancy is issued.

How We Price

No Surprise Invoices
in Granada Hills

An ADU in Granada Hills starts with a free on-site visit and ends with one fixed, written price that covers the whole scope, the permit from LADBS and the inspections, before any work begins.

The three things that change the price are the scope, what the house hides and the finishes you choose, and each is settled in writing before the crew moves on; final payment comes after your walkthrough.

If you want numbers before the visit, the ADU cost guide publishes the current planning ranges.

How It Works

Three Steps.
Zero Surprises.

01

Free Feasibility Visit

We visit your Granada Hills property, confirm what your R1 lot allows, check transit-parking rules, and tell you honestly which path — detached, garage conversion, or JADU — fits your goals and budget.

02

Design, Plans & Permits

We design the unit, use LADBS Standard Plans where they fit, and carry the submittal and corrections through plan check — with a fixed-price proposal set before construction.

03

Build & Deliver

One crew builds the ADU to final inspection sign-off, utilities connected and address issued. You get a rentable, legal second home — final payment only after your walkthrough approval.

Free Feasibility Visit

Start Your Granada Hills
ADU

Tell us about your lot and your goals and we'll get back to you within 4 business hours. We'll confirm what your property allows before you spend anything on plans.

Prefer to talk it through?

(818) 210-4544

Reviews

What Clients Say About
Our ADU Construction Work

★★★★★

ADU build in Sherman Oaks. Permits pulled, inspections passed, project completed in 14 weeks. They were transparent about every step. We're renting the unit already — it's beautiful and fully up to code.

Michael & Diane G.
Detached ADU · Sherman Oaks
Google
★★★★★

We had a complex ADU project that other contractors kept turning down or quoting absurd prices. Right Image Builders handled permits, design, and construction seamlessly. This is the most professional contractor I've ever worked with in 15 years of owning property in LA.

Robert T.
ADU Construction · Sherman Oaks
Yelp
★★★★★

We had tried two other contractors who couldn't navigate the LADBS permit process for our ADU. Right Image Builders had the permit in hand within six weeks of starting design and delivered a beautiful unit on the exact date promised. It's now generating $2,800 a month in rental income. Best investment we've made in this property.

Marcus & Tricia L.
Detached ADU · Encino
Google
Granada Hills ADU FAQ

Questions We
Hear in Granada Hills

Almost certainly. Granada Hills is largely 1950s R1 single-family lots, and California ADU law lets nearly every single-family property add at least one ADU plus a Junior ADU. Granada Hills is one of the highest-volume ADU and garage-conversion areas in the Valley precisely because these tract lots have the room and the alley or driveway access to make it work. We confirm exactly what your specific lot allows at the free site visit.
Under current California rules, a detached ADU can generally be built up to 1,200 sq ft, and a Junior ADU (JADU) is capped at 500 sq ft and must be within the existing home. On typical Granada Hills R1 lots, most detached units we build land in the 600–1,000 sq ft range — a comfortable one or two-bedroom. We size the ADU to your lot, your budget, and whether you're housing family or renting.
Yes — Granada Hills is City of Los Angeles, so your ADU is permitted through LADBS, with Valley submissions handled at the Van Nuys Development Services Center on Van Nuys Boulevard. We manage the whole process, and where it fits we use the LADBS pre-approved Standard Plan Program to speed plan check. You don't deal with the counter or the corrections — we do.
Yes, and it's one of the most cost-effective paths in Granada Hills. These tract homes have detached or attached garages that convert well into a legal ADU — we upgrade the foundation and slab as needed, frame new walls, add insulation, windows, a full kitchen and bath, and bring electrical and plumbing to code, all on permit. A garage conversion typically costs less than a ground-up detached unit.

A garage conversion never needs replacement parking under state ADU law. A new detached unit needs no parking space when the lot is within half a mile walking distance of public transit; parts of Granada Hills sit outside that zone, so we check the parcel. Where a space is required, one tandem space on the existing driveway satisfies it.

A garage conversion or JADU takes 6–10 weeks of design and plan check and 3–5 months of construction, about 5–8 months in all; a detached ADU takes 3–5 months of design, engineering and plan check and 6–9 months of construction, 9–14 months to the Certificate of Occupancy. Yes, you can rent it: a standard ADU can be rented long-term (30 days or more) with no owner-occupancy requirement; only a JADU requires the owner to live on the property.

Right Image Builders, a licensed general contractor (CSLB #1021284) based in Valley Glen about 25 minutes from Granada Hills, designs, permits and builds ADUs across Old Granada Hills along Chatsworth Street, the Knollwood hills north of Rinaldi, the tract streets around Balboa Boulevard under one fixed-price contract: design, permits through LADBS, and construction by one crew, with final payment only after your walkthrough. 5.0★ on Google (45 reviews) and 4.9★ on Angi (103 reviews).

With one fixed, written price after a free on-site visit. We measure the house, confirm what LADBS will require for your address, and itemize the whole scope before you sign; anything uncovered during the work in Granada Hills is priced in writing before the crew continues, and the final payment comes after your walkthrough. Planning ranges are published in the ADU cost guide.

Ready When You Are

Let's Build Your
Granada Hills ADU

Free feasibility visit. Fixed-price proposal. One local team from design and LADBS permits through to a finished, rentable unit.

(818) 210-4544
✓
Request Received
Thank you — a senior member of our team will reach out within 4 business hours. For anything urgent, call (818) 210-4544.

Your information is kept private and never shared. Privacy Policy

By submitting, you agree that Right Image Builders may contact you by phone, text or email about your project, including by automated means. Consent is not a condition of purchase. Message and data rates may apply. See our Privacy Policy and SMS Terms.