ADU build in Sherman Oaks. Permits pulled, inspections passed, project completed in 14 weeks. They were transparent about every step. We're renting the unit already — it's beautiful and fully up to code.

ADU Builder & Contractor in Northridge, CA
Garage conversions, detached ADUs and JADUs on Northridge lots — permits through LADBS, design to Certificate of Occupancy, one fixed-price contract.
Professional, licensed & insuredFixed-price proposalsPermits pulled & closedOur own crew, not subs
Tell us about the project. We call back to schedule the on-site estimate in Northridge.
ADU Builder in Northridge, CA: Right Image Builders (CSLB #1021284) designs, permits and builds ADUs for 1950s–70s ranch and traditional homes, 1,400–2,200 sq ft on 7,000–9,000 sq ft lots, with half-acre estate parcels in Sherwood Forest and Devonshire Highlands across Sherwood Forest, the streets around Cal State Northridge and Devonshire Highlands, with its own crew and permits through LADBS, City of Los Angeles. Plan on 5–8 months for a garage conversion or JADU and 9–14 months for a detached unit, from the first visit to the Certificate of Occupancy. One fixed written price after a free on-site estimate.
Licensed general contractor, CSLB #1021284, licensed since 2016, 5.0★ Google (45 reviews), 4.9★ Angi (103 reviews). Office in Valley Glen, about 20–25 minutes from Northridge. Planning ranges by tier and neighborhood are in the ADU cost guide.
Right Image Builders is a licensed ADU contractor building across Northridge — Sherwood Forest, the streets around Cal State Northridge, Devonshire Highlands, the tract blocks south of Nordhoff Street and the Northridge Fashion Center area. We handle garage conversions, detached ADUs and Junior ADUs from design through LADBS permits to final inspection and the Certificate of Occupancy, on one fixed-price contract; our crew is based in Valley Glen about 20–25 minutes away. CSLB #1021284. Free feasibility visit: (818) 210-4544.
Northridge Lots
and the Second Unit They Can Hold
Northridge lots are generous by Valley standards: 7,000–9,000 sq ft tracts with an attached or detached garage, and half-acre RA and RE parcels in Sherwood Forest and Devonshire Highlands where a full 1,200 sq ft detached unit fits with room to spare. The tract garages convert to a 400–480 sq ft studio or one-bedroom; the estate lots take a two-bedroom unit with its own driveway approach, and some keep the horse-keeping setbacks that come with the zone.
The typical site is a 7,000–9,000 sq ft tract lot with a detached or attached garage, or a Sherwood Forest estate lot with room for a full 1,200 sq ft unit. What decides between a garage conversion, a JADU and a detached unit is that lot, the sewer route and the main panel: 100-amp panels in most 1950s–60s houses and 125–150 amps in the 1970s tracts; a full kitchen with an induction range usually means a 200-amp LADWP upgrade. Every unit gets a full kitchen and bath, its own sub-panel and, for a detached unit, its own address.
One contract covers the whole job: a licensed architect draws the plans, a structural engineer stamps them, we file with LADBS and answer the corrections, and our own crew builds through final inspection and the Certificate of Occupancy. Our office is in Valley Glen, about 20–25 minutes away, and the project lead who does the feasibility visit runs the build.

Three Paths
to a Second Unit
Detached ADUs
A ground-up standalone home in the backyard — up to 1,200 sq ft, one or two bedrooms, its own entrance and address. On typical Northridge R1 lots we most often build in the 600–1,000 sq ft range, sized to the yard and your budget.
Garage Conversions
The most cost-effective Northridge path. We convert your existing detached or attached garage into a legal ADU — foundation and slab upgrades, framing, insulation, windows, a full kitchen and bath, and code electrical and plumbing, all permitted.
Junior ADUs (JADUs)
A JADU (up to 500 sq ft) carved out of the existing house — often a converted bedroom or garage-adjacent space with an efficiency kitchen. The lowest-cost way to add a legal, rentable unit without building new square footage.
LADBS Standard Plans
Where it fits your lot, we use the City of LA's pre-approved ADU Standard Plan Program to shorten plan check and reduce design cost — a faster, more predictable path to permits than a fully custom set of drawings.
Utilities & Site Work
Water, sewer, and electrical connections; addressing; grading and drainage; and the exterior work that ties the ADU into the property. The unglamorous coordination that quietly makes or breaks an ADU timeline — handled in-house.
Design, Permits & Build
One contract from concept to keys: a licensed architect draws the plans, a structural engineer stamps them, we file with LADBS, and our own crew builds through final inspection and the Certificate of Occupancy.
Transparent from the first visit to the closed permit.
Professional, licensed and insured, and we put that in writing at every step, because a remodel is a trust decision before it is a construction decision.
California general contractor license CSLB #1021284 (General Building B), active since 2016, with general liability and workers' compensation insurance. Check the license yourself at cslb.ca.gov before you sign anything, with us or anyone else.
The proposal lists what is demolished, what is built, which finishes are included and which permit covers it. If it is not written down, it is not in the job.
When walls, floors or roofs open up we photograph what is behind them and send you the pictures. Anything beyond the scope is priced in writing before the crew continues. You never find out from the invoice.
California law caps a home-improvement deposit at $1,000 or 10 percent of the contract, whichever is less. We follow it. Progress payments follow the work, and the final payment comes after your walkthrough.
We submit the plans, meet the inspector and close the permit. You get the closed-permit record, which is what a buyer, an insurer or an appraiser will ask for.
The people who estimate the job are the people who build it. No subcontractor hand-offs, no call center; your project lead answers the phone during the job and after it.
Why Northridge
Works for ADUs
Northridge spreads across the northwest Valley from Nordhoff Street north to the 118, with the Cal State Northridge campus at its center, the Northridge Fashion Center on Tampa, Sherwood Forest and Devonshire Highlands on their half-acre lots to the south and north, and the Metrolink station on Wilbur Avenue a mile from campus. Our office is in Valley Glen, about 12 miles southeast, a 20–25 minute drive, and the LADBS counter that reviews Northridge permits is the Van Nuys Development Services Center on Van Nuys Boulevard, on the way.
With Cal State Northridge in the middle of the neighborhood, the ADU math is driven by faculty, staff and student housing, and the Metrolink station on Wilbur gives parcels within half a mile the transit parking waiver for a new detached unit. The utility question is usually the main panel: a 1950s–60s house needs a 200-amp LADWP upgrade before the unit gets its sub-panel, while the 1970s tracts often already have it. We check the panel, the sewer route and the zoning on ZIMAS at the feasibility visit.
An ADU in Northridge is permitted through LADBS (City of Los Angeles) at the Van Nuys Development Services Center under ministerial review, which approves a code-compliant unit without a public hearing, and the utility connections go through LADWP. Units under 750 sq ft pay no impact fees, a garage conversion needs no replacement parking, and the unit can be rented on leases of 30 days or more once the Certificate of Occupancy is issued.
One Fixed Price,
Written Before We Start
Right Image Builders prices an ADU in Northridge the same way every time: a free on-site visit, a measured scope, the LADBS requirements checked for your address, and an itemized fixed price in writing within a few business days.
Hidden conditions are priced in writing when they are found, not on the final invoice; the number you sign is the number you pay, and the final payment follows your walkthrough.
For planning ranges before the visit, see the ADU cost guide.
Three Steps.
Zero Surprises.
Free Feasibility Visit
We visit your Northridge property, confirm what your R1 lot allows, check transit-parking rules, and tell you honestly which path — detached, garage conversion, or JADU — fits your goals and budget.
Design, Plans & Permits
We design the unit, use LADBS Standard Plans where they fit, and carry the submittal and corrections through plan check — with a fixed-price proposal set before construction.
Build & Deliver
One crew builds the ADU to final inspection sign-off, utilities connected and address issued. You get a rentable, legal second home — final payment only after your walkthrough approval.
Start Your Northridge
ADU
Tell us about your lot and your goals and we'll get back to you within 4 business hours. We'll confirm what your property allows before you spend anything on plans.
Prefer to talk it through?
What Clients Say About
Our ADU Construction Work
We had a complex ADU project that other contractors kept turning down or quoting absurd prices. Right Image Builders handled permits, design, and construction seamlessly. This is the most professional contractor I've ever worked with in 15 years of owning property in LA.
We had tried two other contractors who couldn't navigate the LADBS permit process for our ADU. Right Image Builders had the permit in hand within six weeks of starting design and delivered a beautiful unit on the exact date promised. It's now generating $2,800 a month in rental income. Best investment we've made in this property.
Read before you hire anyone.
Plain answers on costs, permits, materials and hiring, written for Los Angeles houses and kept current.
How Much Does an ADU Cost in Los Angeles in 2026?
How much does an ADU cost in Los Angeles in 2026? Ranges by neighborhood.
Read the guide →Decision guideGarage Conversion, Detached ADU or JADU: Which ADU Should You Build in Los Angeles?
2026 Los Angeles comparison: size, cost, timeline, parking, fees, rentals.
Read the guide →Decision guidePrefab or Site-Built ADU in Los Angeles: Which Should You Choose?
Prefab (modular) or site-built ADU in Los Angeles? Real totals once site work is counted, timelines, permits, lot…
Read the guide →AnswersADU rules and questions
Direct answers from the Los Angeles remodeling FAQ, kept current.
Read the answers →Questions We
Hear in Northridge
A garage conversion never needs replacement parking under state ADU law. A new detached unit needs no parking space when the lot is within half a mile walking distance of public transit, which covers much of Northridge near Metrolink at Northridge station on Wilbur Avenue, a mile from the Cal State Northridge campus. Where a space is required, one tandem space on the existing driveway satisfies it.
A garage conversion or JADU takes 6–10 weeks of design and plan check and 3–5 months of construction, about 5–8 months in all; a detached ADU takes 3–5 months of design, engineering and plan check and 6–9 months of construction, 9–14 months to the Certificate of Occupancy. Yes, you can rent it: a standard ADU can be rented long-term (30 days or more) with no owner-occupancy requirement; only a JADU requires the owner to live on the property.
Right Image Builders, a licensed general contractor (CSLB #1021284) based in Valley Glen about 20–25 minutes from Northridge, designs, permits and builds ADUs across Sherwood Forest, the streets around Cal State Northridge, Devonshire Highlands under one fixed-price contract: design, permits through LADBS, and construction by one crew, with final payment only after your walkthrough. 5.0★ on Google (45 reviews) and 4.9★ on Angi (103 reviews).
With one fixed, written price after a free on-site visit. We measure the house, confirm what LADBS will require for your address, and itemize the whole scope before you sign; anything uncovered during the work in Northridge is priced in writing before the crew continues, and the final payment comes after your walkthrough. Planning ranges are published in the ADU cost guide.
Kitchen Remodeling in Northridge
Open-plan conversions & full remodels →
Same CityBathroom Remodeling in Northridge
Tub-to-shower conversions & re-piping →
Same CityRoom Additions in Northridge
Rear additions, suites & second stories →
Service HubADU Construction — All of LA
Detached, garage conversion, JADU →
Same CitySiding Contractor in Northridge
Fiber cement, stucco and repair →
NearbyADU Builder in Granada Hills
Nearby neighborhood →
NearbyADU Builder in Reseda
Nearby neighborhood →
Planning GuideADU Cost in Los Angeles
2026 planning ranges →
See Our WorkProject Portfolio
Recent projects across the Valley →
Planning GuideGarage Conversion vs. Detached ADU vs. JADU (2026)
Which ADU fits the lot →
Planning GuidePrefab vs. Site-Built ADU (2026)
Which path for your lot →
Deck WaterproofingDeck & Balcony Waterproofing in Northridge
Decks, balconies and walkways repaired, flashed and coated →
Let's Build Your
Northridge ADU
Free feasibility visit. Fixed-price proposal. One local team from design and LADBS permits through to a finished, rentable unit.
(818) 210-4544