Bathroom Remodeling · Northridge, CA

Bathroom Remodeling in Northridge, CA

Tub-to-shower conversions, curbless showers, full tile renovations and honest re-plumbing for Northridge's 1950s–70s ranch homes — permitted through LADBS, one crew, one fixed price.

Northridge bathroom remodel cost (2026): Refresh $20K–$30K; Tub-to-Shower $25K–$38K; Primary Renovation $38K–$60K+. Time on site 3–6 weeks, the longer end for a gut primary bath with relocated plumbing.

Permits: LADBS, City of Los Angeles. One fixed price after a free on-site estimate from a licensed general contractor, CSLB #1021284, based in Valley Glen about 20–25 minutes from Northridge.

Updated October 2026 · Right Image Builders project team · CSLB #1021284 · 5.0★ Google (45 reviews) · 4.9★ Angi (103 reviews)

Right Image Builders is a licensed general contractor remodeling bathrooms across Northridge — Sherwood Forest, the streets around Cal State Northridge, Devonshire Highlands, the tract blocks south of Nordhoff Street and the Northridge Fashion Center area. We build walk-in and curbless showers, full tile renovations, and vanity and plumbing upgrades, with every permit pulled through LADBS (City of Los Angeles) at the Van Nuys Development Services Center and one fixed price after a free on-site estimate; our crew is based in Valley Glen about 20–25 minutes away. CSLB #1021284. Call (818) 210-4544.

The Right Image Approach

Northridge Baths,
Fixed From the Pipes Out

A Northridge bathroom depends on the decade: the 1950s–60s tracts have the 5-by-8 hall bath with galvanized lines and a cast-iron drain, while the 1970s houses and the estate lots have copper lines, larger primary baths and tile that was fashionable in 1975. Behind either one the work is the same: waterproofing, slope, ventilation to the outside and supply lines that will outlast the tile.

Behind the new tile, the Northridge house sets the scope. The plumbing is typically galvanized supply lines in the 1950s–60s houses, copper in the 1970s tracts, slab floors almost everywhere, and chimneys and cripple walls that still carry 1994 earthquake repairs. The waterproofing, the slope of the pan and the ventilation to the outside are what decide whether the room lasts, so our proposal prices the pan and the re-pipe before the finishes, and the electrical gets GFCI-protected circuits and a properly ducted fan on every job.

Our office is in Valley Glen, about 20–25 minutes away, so the project lead who does your estimate is on site through the 3–6 weeks the build takes, and most Northridge families stay in the home. The site is cleaned every evening and the rest of the house stays livable.

Request Free Bathroom Estimate
Bathroom remodel finish level by Right Image Builders
The finish level we build to across the Valley; Northridge bathroom photos follow as each project completes.
What We Build

Full Scope,
Done Right the First Time

01

Tub-to-Shower Conversions

The signature Northridge bathroom project. We pull the old tub, reframe and waterproof the shower, set a properly sloped curbed or curbless pan, and tile it with a linear or center drain — plus niches, benches, and blocking for grab bars if you want it aging-in-place ready.

02

Waterproofing Done Correctly

This is where corners get cut and ceilings leak. We use proper hot-mop or sheet/liquid membrane systems, sloped pre-slope under the pan, and correct curb and niche detailing — the invisible layer that decides whether a bathroom lasts 20 years or 2.

03

Tile, Stone & Glass

Porcelain, natural stone, handmade ceramic, zellige, and full-height shower walls — installed by our in-house tile crew with proper edge and transition systems. Frameless glass enclosures templated and installed to fit.

04

Vanities, Fixtures & Lighting

Floating or freestanding vanities, quartz or stone tops, undermount sinks, wall-hung or comfort-height toilets, and layered lighting with proper GFCI-protected circuits and exhaust ventilation sized to the room.

05

Re-Plumbing & Re-Piping

With the walls open, it's the moment to replace tired galvanized supply lines with copper or PEX, update the drain and vent, and move plumbing to support a new layout — restoring the water pressure these older Northridge homes lost decades ago.

06

Permits & Inspections

All plumbing, electrical, and shower work permitted through LADBS and carried to signed-off final inspection. We handle the submission and the corrections so the finished bathroom is fully legal and documented.

Building in Northridge

What We Find Behind
Northridge Tile

Northridge spreads across the northwest Valley from Nordhoff Street north to the 118, with the Cal State Northridge campus at its center, the Northridge Fashion Center on Tampa, Sherwood Forest and Devonshire Highlands on their half-acre lots to the south and north, and the Metrolink station on Wilbur Avenue a mile from campus. Our office is in Valley Glen, about 12 miles southeast, a 20–25 minute drive, and the LADBS counter that reviews Northridge permits is the Van Nuys Development Services Center on Van Nuys Boulevard, on the way.

The most requested project here is the primary-bath renovation in the 1960s–70s ranches, where there is already room for a double vanity and a walk-in shower where the tub-and-shower combo stood; in the tracts it is the tub-to-shower conversion in the hall bath. Almost everything in Northridge sits on a slab, so relocated drains mean cutting concrete, and we lay out the fixtures to keep the drain where it is whenever the plan allows.

Plumbing and electrical work in Northridge is permitted through LADBS (City of Los Angeles) at the Van Nuys Development Services Center, with the rough and final inspections scheduled around the build so the schedule does not slip; every bathroom we build is permitted.

What It Costs

Northridge Bathroom Remodel
Planning Ranges (2026)

Project TierTypical RangeWhat's Involved
Refresh$20K–$30KSame footprint: new tile, vanity, toilet, fixtures, and lighting — a guest or hall bath brought fully up to date.
Tub-to-Shower$25K–$38KRemove the tub, build a waterproofed walk-in or curbless shower, new tile, glass, and vanity — often with local re-piping.
Primary Renovation$38K–$60K+Reconfigured layout, relocated plumbing, curbless spa shower, double vanity, custom tile, and full electrical and ventilation upgrades.

Ranges are typical Northridge estimates for planning only and move with size, finish level, structural scope and site access; after the free on-site visit you get an itemized fixed price in writing.

How It Works

Three Steps.
Zero Surprises.

01

Free On-Site Consultation

A senior team member visits your Northridge bathroom, assesses what's behind the walls where we can, and gives you an honest read on cost, timeline, and whether a re-pipe is worth doing.

02

Fixed-Price Proposal

Within 3–5 business days you get an itemized, fixed-price proposal — tile, glass, plumbing, permits, labor. The number is committed before we start.

03

Build & Deliver

One crew, all LADBS permits, correct waterproofing you can trust. We hand you a finished bathroom with a closed permit. Final payment only after your walkthrough approval.

Free Estimate

Get Your Northridge
Bathroom Quote

Tell us about your bathroom and we'll get back to you within 4 business hours with next steps. No obligation, no sales pressure — just a straight answer on what your project takes.

Prefer to talk it through?

(818) 210-4544
✓
Request Received
Thank you — a senior member of our team will reach out within 4 business hours. For anything urgent, call (818) 210-4544.

Your information is kept private and never shared. Privacy Policy

Reviews

What Clients Say About
Our Bathroom Remodeling Work

★★★★★

The team completely transformed our master bathroom. From the initial consultation to the final walkthrough, the communication was impeccable. They finished on time, on budget, and the craftsmanship is absolutely stunning. I've already referred them to three neighbors.

Jennifer M.
Primary Bathroom Remodel · Encino
Google
★★★★★

I had three contractors look at my bathroom before Right Image Builders. They were the only ones who came prepared with a real scope document and a fixed price. Six weeks later — my bathroom is incredible. The tile work alone is worth every penny.

Maria L.
Bathroom Remodel
Google
★★★★★

Two bathrooms, new hardwood floors, kitchen cabinets, and a laundry room — all in one project. Right Image Builders coordinated everything flawlessly. They answered every text within the hour. This is how construction is supposed to work.

James P.
Two Bathrooms, Kitchen & Laundry
Google
Northridge Bathroom FAQ

Questions We
Hear in Northridge

Yes. Northridge is City of Los Angeles, so bathroom permits go through LADBS — typically the Van Nuys Development Services Center on Van Nuys Boulevard, about 20–25 minutes from our Valley Glen office. Any time we move plumbing, add or relocate a shower, or touch electrical, that work is permitted and inspected. We handle submission, corrections, and final sign-off; you never deal with the counter.

Northridge bathroom remodel cost (2026): Refresh $20K–$30K; Tub-to-Shower $25K–$38K; Primary Renovation $38K–$60K+. Time on site 3–6 weeks, the longer end for a gut primary bath with relocated plumbing. The exact figure depends on size, finishes and structural work; after the free on-site visit you get an itemized fixed price in writing.

Yes — tub-to-shower conversions are one of our most requested Northridge projects. We remove the old tub, reframe and waterproof the shower area, set a proper sloped pan (curbed or fully curbless), and tile it out with a linear or center drain. If you want a zero-threshold, aging-in-place shower, we build the floor and blocking to support grab bars and a bench.
Often, yes. Many 1950s Northridge homes still have original galvanized steel supply lines that have corroded and choked down water pressure over the decades. When we open the walls for a bathroom remodel, it's the ideal time to re-pipe the bathroom in copper or PEX. We'll assess the existing plumbing at the estimate and tell you honestly whether a re-pipe is worth doing while the walls are open.
A standard Northridge bathroom remodel runs about 3–5 weeks from construction start. A guest-bath refresh on the same footprint is faster; a full master bath with moved plumbing, a curbless shower, and custom tile takes longer. You get a committed milestone schedule before demolition, plus realistic guidance on tile lead times so nothing stalls mid-project.

Yes. Right Image Builders is a licensed California general contractor, CSLB #1021284, with general liability and workers' compensation insurance; verify the license in minutes at cslb.ca.gov under "Check a License" and ask us for the insurance certificates. The Northridge estimate is free and on site, done by the project lead who will run the job, and the itemized fixed-price proposal follows within 3–5 business days.

Right Image Builders, a licensed general contractor (CSLB #1021284) based in Valley Glen about 20–25 minutes from Northridge, remodels bathrooms across Sherwood Forest, the streets around Cal State Northridge, Devonshire Highlands under one fixed-price contract: design, permits through LADBS, and construction by one crew, with final payment only after your walkthrough. 5.0★ on Google (45 reviews) and 4.9★ on Angi (103 reviews).

Go to cslb.ca.gov, choose "Check a License" and enter the number; ours is 1021284. Confirm the license is active, classified B (General Building Contractor), bonded, and shows workers' compensation. Then ask for a written fixed-price contract with scope, materials, schedule and payment terms; California law requires it, and it is the only way to hold any contractor to the promise.

Ready When You Are

Let's Build Your
Northridge Bathroom

Free on-site consultation. Fixed-price proposal. One local team, correct waterproofing, and every LADBS permit pulled and closed.

(818) 210-4544
✓
Request Received
Thank you — a senior member of our team will reach out within 4 business hours. For anything urgent, call (818) 210-4544.

Your information is kept private and never shared. Privacy Policy

CallFree Estimate