Tub-to-Shower Conversion or Full Bathroom Remodel: Which Does Your Bathroom Need?

If the layout works, the conversion fixes the one thing most people hate about a 1950s bathroom. If the plumbing has to move, you are already in a full remodel. How to tell which one you are in.

By Right Image Builders · Los Angeles General Contractor · CSLB #1021284Published October 16, 2026Updated October 16, 2026

Convert the tub to a shower when the bathroom's layout works and the fixtures can stay where they are: the tub comes out, a waterproofed walk-in shower goes in its footprint, and the vanity, toilet and floor are refreshed around it. Choose a full remodel when the plumbing has to move, the room needs to grow, the supply lines are galvanized or you want a primary bath rather than a repaired one. In 2026 across the San Fernando Valley a tub-to-shower conversion runs $22K–$52K and a primary-bath renovation $35K–$95K+, with 3–6 weeks on site once the permit is issued; a refresh in the same layout runs $18K–$40K.

The ranges are planning numbers from Right Image Builders' neighborhood pages; every bathroom we build is permitted, and the fixed price follows a free on-site estimate. Licensed general contractor, CSLB #1021284, based in Valley Glen.

Updated October 2026 · Right Image Builders project team · CSLB #1021284 · 5.0★ Google (45 reviews) · 4.9★ Angi (103 reviews)

What a tub-to-shower conversion includes

The tub comes out and a walk-in shower takes its place: a sloped, waterproofed pan, tile walls, frameless glass, a niche and often a bench, with the drain and the valve relocated as the new layout needs. Because the shower lands in the tub's footprint, the toilet and vanity usually stay where they are, and the rest of the room is refreshed around the new shower: vanity, counter, faucet, toilet, lighting, exhaust fan, flooring and paint. It is the project that turns a 1950s tub nobody uses into the bathroom's best feature.

In the Valley the conversion runs $22K–$52K. The waterproofing, the pan, the tile and the glass are the price; the finish selections and whether the valve moves decide where in the range the project lands. It takes 3–6 weeks on site once the permit is issued, and because the plumbing and electrical almost always change, it is permitted.

What a full bathroom remodel includes

A full remodel takes the room to the studs and rebuilds it to a new plan: the plumbing relocated, a larger shower or a freestanding tub, a double vanity, heated floors, new lighting and ventilation, new drywall and tile throughout, and often a wall moved to borrow space from a closet or a hall. The galvanized supply lines and the cast-iron drain are replaced while the walls are open, and a primary bath usually adds a dedicated circuit or two.

The primary-bath tier runs $35K–$95K+ in the Valley: a refresh that keeps every fixture in place is $18K–$40K, a gut remodel with relocated plumbing, custom tile and heated floors is 5–7 weeks on site at the top of the range. It is the project for a bathroom whose plan, not just whose tub, is the problem.

Tub-to-shower vs. full remodel at a glance

Tub-to-shower conversionFull bathroom remodel
2026 planning range$22K–$52K$35K–$95K+ (refresh in place $18K–$40K)
LayoutUnchanged; the shower takes the tub's footprintNew plan; plumbing relocated, walls sometimes moved
PlumbingDrain and valve adjusted within the old footprintSupply and drain rerouted; galvanized and cast iron replaced
ElectricalLighting and fan updatedNew circuits, heated floor, lighting plan
PermitYes: plumbing and electrical changeYes: plumbing, electrical, often framing
Weeks on site3–6, the short end for a simple conversion5–7 for a gut primary bath
Second bathroom needed?Helpful; the room is out of service for the durationYes, or a plan for 5–7 weeks without it
ResaleModernizes the house's weakest room at the lowest costCreates the primary suite buyers in updated tracts expect
Best forA bathroom with a workable plan and a tub nobody usesA bathroom whose plan, size or plumbing is the problem

Which one is your bathroom?

Three questions decide it. Does the layout work, with the toilet, the vanity and the tub where you would put them again? Are the pipes behind the walls still galvanized steel, with pressure that drops when the kitchen tap runs? And is the bathroom supposed to become something else, a primary bath with a double vanity and a separate shower, rather than a better version of itself?

If the layout works and the pipes have been replaced, convert the tub and refresh the rest: it is the best money a Valley bathroom can spend. If the pipes are original, the walls are coming open anyway, and the full remodel costs less than doing the conversion now and the re-pipe later. If the room has to change shape or purpose, you were never in the conversion tier.

Curbless, walk-in and the slab question

A walk-in shower with a low curb fits any conversion. A curbless shower, with the floor sloping to the drain and no step at all, depends on the foundation. On a raised foundation the floor can be dropped between the joists and the work is in the crawlspace; on a slab, which most 1950s Valley tracts in Van Nuys and North Hollywood have, the slab is cut and recessed, which adds a day of concrete work and the price that goes with it. Both are permitted, both are inspected before the walls close, and both are the right call for a bathroom that has to work for someone with limited mobility.

Permits and inspections

Every tub-to-shower conversion and every full remodel is permitted, because the plumbing and electrical change. In the City of Los Angeles a bathroom with no structural change usually gets an express permit with no plan check; Burbank, Glendale and Beverly Hills issue theirs through their own building departments. The rough inspection happens before the walls close, the final after the glass and fixtures are in, and California's Title 24 rules for high-efficacy lighting and a ducted exhaust fan apply to both tiers. The bathroom page shows the process step by step.

Resale: should the house keep a tub?

If the house has more than one bathroom, keep a tub in one of them; families with small children and some buyers expect it, and the conversion in the primary or hall bath costs you nothing in resale. In a one-bathroom house the decision is personal: a walk-in shower is easier to use for longer and the room looks a generation newer, but the conversion is reversible only at the cost of another remodel. Updated tracts in Sherman Oaks and Burbank now treat a primary bath with a real shower as the baseline.

What we recommend

Walk the bathroom with the three questions. Workable plan, replaced pipes, a tub that never gets used: convert it, refresh the room and be done in 3–6 weeks. Original plumbing, a cramped plan or a bathroom that should become a primary bath: do the full remodel once, with the re-pipe, the circuits and the permit inside the price. Either way the free on-site estimate ends with a written recommendation and an itemized fixed price; the bathroom cost guide and the bathroom section of our FAQ cover the rest.

Sources (checked October 2026): Los Angeles Department of Building and Safety, plan check and permit information; California Energy Commission, Building Energy Efficiency Standards (Title 24, Part 6): residential lighting, ventilation and envelope requirements in remodels; Right Image Builders service and neighborhood pages (2026 planning ranges, timelines, permit authorities). Cost figures are Right Image Builders' 2026 planning ranges from its service and neighborhood pages.

FAQ

Frequently Asked
Questions

Yes. The drain and valve change, the shower pan is a plumbing fixture and the lighting and fan are usually updated, all of which require a permit through LADBS or, in Burbank, Glendale and Beverly Hills, the city's own building department. The rough-in is inspected before the walls close and the finished shower at final.

For the whole project: 3–6 weeks on site once the permit is issued, the short end for a straightforward conversion with the valve left in place. A house with a second bathroom barely notices; a one-bathroom house needs a plan, which we build into the schedule before demolition.

Yes. The slab is cut and recessed so the floor can slope to the drain without a step, which adds a day of concrete work and its cost. On a raised foundation the same result comes from dropping the floor between the joists. Both versions are permitted and inspected before the tile goes on.

In a house with two or more bathrooms, yes: the converted bath looks a generation newer and the tub that families and some buyers want still exists elsewhere. In a one-bathroom house keep the decision personal; a walk-in shower suits long-term living, but a few buyers will miss the tub.

If the walls are open and the supply lines are still galvanized steel, yes, and at that point the project is a full remodel rather than a conversion. Replacing the lines with copper or PEX while the tile is off costs a fraction of opening the walls again later, and it ends the pressure drop that galvanized pipe causes.

A refresh keeps every fixture, including the tub, where it is and renews the surfaces around them: tile, vanity, toilet, lighting, fan and paint, $18K–$40K in the Valley. A conversion removes the tub and builds a waterproofed walk-in shower in its footprint, $22K–$52K, with the drain and valve adjusted to suit.

Planning a Project?

Find Out Which Scope
Your Bathroom Needs

Free on-site estimate across the San Fernando Valley. We check the plan, the pipes and the foundation, and recommend a scope in writing with an itemized fixed price.

(818) 210-4544
✓
Request Received
Thank you — a senior member of our team will reach out within 4 business hours. For anything urgent, call (818) 210-4544.

Your information is kept private and never shared. Privacy Policy

CallFree Estimate