ADU build in Sherman Oaks. Permits pulled, inspections passed, project completed in 14 weeks. They were transparent about every step. We're renting the unit already — it's beautiful and fully up to code.

ADU Builder & Contractor in Beverly Hills, CA
Garage conversions, detached ADUs and JADUs on Beverly Hills lots — permits through the City of Beverly Hills, design to Certificate of Occupancy, one fixed-price contract.
Beverly Hills ADU cost (2026): JADU $110K–$180K; Garage Conversion $160K–$240K; Detached ADU $300K–$500K+. Garage conversion or JADU: 6–10 weeks of design and plan check, then 3–5 months of construction, about 5–8 months in all. Detached ADU: 3–5 months of design, engineering and plan check, then 6–9 months of construction, 9–14 months to the Certificate of Occupancy.
Permits: the City of Beverly Hills Building & Safety Division, not LADBS. One fixed price after a free on-site estimate from a licensed general contractor, CSLB #1021284, based in Valley Glen about 25–35 minutes from Beverly Hills.
Right Image Builders is a licensed ADU contractor building across Beverly Hills — the Flats north of Santa Monica Boulevard, Trousdale Estates, the hillside streets north of Sunset, the blocks south of Wilshire and the Beverly Hills Gateway. We handle garage conversions, detached ADUs and Junior ADUs from design through the City of Beverly Hills permits to final inspection and the Certificate of Occupancy, on one fixed-price contract; our crew is based in Valley Glen about 25–35 minutes away. CSLB #1021284. Free feasibility visit: (818) 210-4544.
Beverly Hills Lots
and the Second Unit They Can Hold
Beverly Hills reviews ADUs under its own ordinance and through its own Building & Safety Division, ministerially as state law requires, but with the city's single-family rules for the Central Area, the Hillside Area and Trousdale Estates layered on top. The Flats are the easiest sites: 8,000–20,000 sq ft lots with a detached garage on an alley, where a conversion or a new detached unit keeps its own entrance without crossing the main house; the hillside parcels above Sunset need the slope and the access designed first, and Trousdale's 14-foot height limit rules out a second-story unit.
The typical site is an 8,000–20,000 sq ft Central Area lot with a detached garage and alley access, or a hillside parcel where slope and the Hillside Area rules set the design. What decides between a garage conversion, a JADU and a detached unit is that lot, the sewer route and the main panel: older 100- to 125-amp panels in large houses; a 48-inch range, column refrigeration and EV charging usually mean a 200-amp Southern California Edison service upgrade. Every unit gets a full kitchen and bath, its own sub-panel and, for a detached unit, its own address.
One contract covers the whole job: a licensed architect draws the plans, a structural engineer stamps them, we file with the City of Beverly Hills and answer the corrections, and our own crew builds through final inspection and the Certificate of Occupancy. Our office is in Valley Glen, about 25–35 minutes away, and the project lead who does the feasibility visit runs the build.

Three Paths
to a Second Unit
Detached ADUs
A ground-up standalone home in the backyard — up to 1,200 sq ft, one or two bedrooms, its own entrance and address. On typical Beverly Hills R1 lots we most often build in the 600–1,000 sq ft range, sized to the yard and your budget.
Garage Conversions
The most cost-effective Beverly Hills path. We convert your existing detached or attached garage into a legal ADU — foundation and slab upgrades, framing, insulation, windows, a full kitchen and bath, and code electrical and plumbing, all permitted.
Junior ADUs (JADUs)
A JADU (up to 500 sq ft) carved out of the existing house — often a converted bedroom or garage-adjacent space with an efficiency kitchen. The lowest-cost way to add a legal, rentable unit without building new square footage.
City ADU Review
Beverly Hills reviews ADUs ministerially under its own ordinance: a complete, code-compliant application is approved without a public hearing. We prepare the submittal to the city's own plan-check list, answer the corrections and schedule every inspection through the Certificate of Occupancy.
Utilities & Site Work
Water, sewer, and electrical connections; addressing; grading and drainage; and the exterior work that ties the ADU into the property. The unglamorous coordination that quietly makes or breaks an ADU timeline — handled in-house.
Design, Permits & Build
One contract from concept to keys: a licensed architect draws the plans, a structural engineer stamps them, we file with the City of Beverly Hills, and our own crew builds through final inspection and the Certificate of Occupancy.
Why Beverly Hills
Works for ADUs
Beverly Hills is its own city with its own Building & Safety Division at City Hall, its own water utility and Southern California Edison for power, and a single-family zoning code divided into three regulated areas: the Central Area, which is the Flats north of Santa Monica Boulevard, the Hillside Area north of Sunset, and Trousdale Estates with its 14-foot single-story height limit. The blocks south of Wilshire carry the city's 1930s–50s single-family and duplex streets. Our office is in Valley Glen, about 10 miles north over Coldwater Canyon or Beverly Glen, a 25–35 minute drive. One caution: Beverly Hills Post Office addresses north of the city line are City of Los Angeles and go through LADBS, and we confirm the jurisdiction on the parcel before anyone draws a plan.
No replacement parking is required when a garage converts, units under 750 sq ft are exempt from impact fees, and the city must act on a complete application within 60 days; what changes is the submittal, which follows Beverly Hills' own plan-check list, and the utilities, which are the city's water service and Southern California Edison rather than LADWP. We check the zoning on the city's parcel map, the panel, the sewer route and the area rules at the feasibility visit, and file at City Hall.
An ADU in Beverly Hills is permitted through the City of Beverly Hills Community Development Department, Building & Safety Division, under ministerial review, which approves a code-compliant unit without a public hearing, and the utility connections go through the City of Beverly Hills water utility and Southern California Edison. Units under 750 sq ft pay no impact fees, a garage conversion needs no replacement parking, and the unit can be rented on leases of 30 days or more once the Certificate of Occupancy is issued.
Beverly Hills ADU
Planning Ranges (2026)
| ADU Type | Typical Range | What's Involved |
|---|---|---|
| JADU | $110K–$180K | Up to 500 sq ft carved from the existing home with an efficiency kitchen and bath. The lowest-cost legal unit. |
| Garage Conversion | $160K–$240K | Convert an existing garage to a full legal ADU — foundation/slab upgrades, framing, kitchen, bath, and code systems. |
| Detached ADU | $300K–$500K+ | Ground-up standalone unit; high-finish detached builds matched to Toluca Lake's traditional and Spanish homes reach the top of the range. |
Ranges are typical Beverly Hills estimates for planning only and move with size, finish level, structural scope and site access; after the free on-site visit you get an itemized fixed price in writing.
Three Steps.
Zero Surprises.
Free Feasibility Visit
We visit your Beverly Hills property, confirm what your R1 lot allows, check transit-parking rules, and tell you honestly which path — detached, garage conversion, or JADU — fits your goals and budget.
Design, Plans & Permits
We design the unit, prepare the submittal to the city's own plan-check list, and carry the submittal and corrections through plan check — with a fixed-price proposal set before construction.
Build & Deliver
One crew builds the ADU to final inspection sign-off, utilities connected and address issued. You get a rentable, legal second home — final payment only after your walkthrough approval.
Start Your Beverly Hills
ADU
Tell us about your lot and your goals and we'll get back to you within 4 business hours. We'll confirm what your property allows before you spend anything on plans.
Prefer to talk it through?
(818) 210-4544What Clients Say About
Our ADU Construction Work
We had a complex ADU project that other contractors kept turning down or quoting absurd prices. Right Image Builders handled permits, design, and construction seamlessly. This is the most professional contractor I've ever worked with in 15 years of owning property in LA.
We had tried two other contractors who couldn't navigate the LADBS permit process for our ADU. Right Image Builders had the permit in hand within six weeks of starting design and delivered a beautiful unit on the exact date promised. It's now generating $2,800 a month in rental income. Best investment we've made in this property.
Questions We
Hear in Beverly Hills
A garage conversion never needs replacement parking under state ADU law. A new detached unit needs no parking space when the lot is within half a mile walking distance of public transit; parts of Beverly Hills sit outside that zone, so we check the parcel. Where a space is required, one tandem space on the existing driveway satisfies it.
A garage conversion or JADU takes 6–10 weeks of design and plan check and 3–5 months of construction, about 5–8 months in all; a detached ADU takes 3–5 months of design, engineering and plan check and 6–9 months of construction, 9–14 months to the Certificate of Occupancy. Yes, you can rent it: a standard ADU can be rented long-term (30 days or more) with no owner-occupancy requirement; only a JADU requires the owner to live on the property.
Right Image Builders, a licensed general contractor (CSLB #1021284) based in Valley Glen about 25–35 minutes from Beverly Hills, designs, permits and builds ADUs across the Flats north of Santa Monica Boulevard, Trousdale Estates, the hillside streets north of Sunset under one fixed-price contract: design, permits through the City of Beverly Hills, and construction by one crew, with final payment only after your walkthrough. 5.0★ on Google (45 reviews) and 4.9★ on Angi (103 reviews).
Kitchen Remodeling in Beverly Hills
Open-plan conversions & full remodels →
Same CityBathroom Remodeling in Beverly Hills
Tub-to-shower conversions & re-piping →
Same CityRoom Additions in Beverly Hills
Rear additions, suites & second stories →
Service HubADU Construction — All of LA
Detached, garage conversion, JADU →
NearbyADU Builder in Encino
Nearby neighborhood →
NearbyADU Builder in Sherman Oaks
Nearby neighborhood →
Planning GuideADU Cost in Los Angeles
2026 planning ranges →
See Our WorkProject Portfolio
Recent projects across Los Angeles →
Planning GuideGarage Conversion vs. Detached ADU vs. JADU (2026)
Which ADU fits the lot →
Let's Build Your
Beverly Hills ADU
Free feasibility visit. Fixed-price proposal. One local team from design and Beverly Hills Building and Safety permits through to a finished, rentable unit.
(818) 210-4544
