Siding Contractor · Beverly Hills, CA

Siding Contractor
in Beverly Hills, CA
Done Right, Once.

Fiber cement, stucco, wood and metal on Beverly Hills houses, replaced or repaired by our own crew with the weather barrier and flashing done properly, the permit pulled through the city, and a 10-year workmanship warranty in writing.

Siding Contractor in Beverly Hills, CA: Right Image Builders (CSLB #1021284) replaces and repairs siding and stucco for 1920s–60s Spanish, Traditional and mid-century estates, 2,500–5,000+ sq ft on 8,000–20,000+ sq ft lots in the Flats and the hills, with 1930s–50s single-family and duplex blocks south of Wilshire across the Flats north of Santa Monica Boulevard, Trousdale Estates and the hillside streets north of Sunset, with its own crew and permits through the City of Beverly Hills Building and Safety Division. 2–4 weeks on site for a single-story house; 4–6 weeks for two-story and hillside houses. One fixed written price after a free on-site estimate.

Licensed general contractor, CSLB #1021284, licensed since 2016, 5.0★ Google (45 reviews), 4.9★ Angi (103 reviews). Office in Valley Glen, about 25–35 minutes from Beverly Hills. Planning ranges by tier and neighborhood are in the siding cost guide.

Updated October 2026 · Right Image Builders project team · CSLB #1021284 · 5.0★ Google (45 reviews) · 4.9★ Angi (103 reviews)

Right Image Builders is a licensed siding contractor serving Beverly Hills: fiber cement (James Hardie and similar), three-coat re-stucco and stucco repair, engineered and natural wood, metal, and stucco-to-siding conversions, with the dry rot, flashing and window repairs behind the wall handled under the same contract. We build to the California Wildland-Urban Interface Code in the fire-hazard zones of Beverly Hills. 10-year written workmanship warranty. Free on-site estimate: (818) 210-4544.

Key facts

Siding in Beverly Hills
at a Glance

01

Time on site

2–4 weeks for a single-story house; 4–6 weeks for two-story and hillside houses that need scaffolding on every elevation.

02

Permits

The City of Beverly Hills Building & Safety Division, not LADBS; pulled, inspected and closed by us before the final payment.

03

Fire-hazard zone

Hillside parcels may be in a Very High Fire Hazard Severity Zone; checked per address.

04

Proof

Licensed general contractor, CSLB #1021284, own siding crew, 10-year written workmanship warranty, 5.0★ Google (45 reviews).

05

Who does the work

Our own crew, under one licensed general contractor (CSLB #1021284), on one permitted contract.

06

How we price

One fixed, written price after a free on-site visit; hidden conditions priced in writing before the crew continues; final payment after your walkthrough.

Houses in Beverly Hills

What Beverly Hills Walls
Usually Need

The houses we re-side in Beverly Hills are mostly 1920s–60s Spanish, Traditional and mid-century estates, 2,500–5,000+ sq ft on 8,000–20,000+ sq ft lots in the Flats and the hills, with 1930s–50s single-family and duplex blocks south of Wilshire. Around the Flats north of Santa Monica Boulevard, Trousdale Estates, the hillside streets north of Sunset, the blocks south of Wilshire and the Beverly Hills Gateway the walls tell the same story we see across the Westside: original stucco or wood from the first build, patched over the decades, with the weather barrier behind it long past its life.

On a Spanish or stucco house the honest answer is usually stucco again: a re-coat when the base is sound, a full three-coat re-stucco when it rings hollow or has let water in. Hillside and canyon houses add scaffolding on every elevation and, in the fire zone, a noncombustible exterior: fiber cement, metal panels or three-coat stucco. On larger two-story houses and estates, board-and-batten fiber cement panel or standing-seam metal suits the scale; the planning figures scale with wall area, which on a 3,500 sq ft house can be 4,000 sq ft or more.

Either way the sequence does not change: tear-off to the sheathing, dry-rot and framing repair priced in writing, a new weather-resistive barrier with flashing at every window, deck ledger and corner, then the siding or lath. Beverly Hills is 25–35 minutes from our Valley Glen office, so the same crew that measures the house builds it.

Request a free siding estimate
Siding tear-off to the sheathing before a new weather barrier and fiber cement siding — Right Image Builders, serving Beverly Hills
Tear-off and dry-rot inspection on a recent re-side, 2026
How We Price

How We Price a Siding replacement
in Beverly Hills

Every siding replacement in Beverly Hills gets one fixed, written price after a free on-site visit: we measure the house, check what the City of Beverly Hills Building and Safety Division requires for the lot and price the whole scope before you sign anything.

What moves the number is the scope you choose, the condition we find behind the walls and the finish level, never a surprise invoice: anything we uncover during the work is priced in writing before the crew continues, and the final payment comes after your walkthrough.

Setting a budget first? The siding cost guide shows the current planning ranges by tier and neighborhood.

Permits and the Fire Code

Permits and the Fire Code
in Beverly Hills

Siding in Beverly Hills is permitted by the City of Beverly Hills Community Development Department, Building & Safety Division, at City Hall, 455 N. Rexford Drive, not LADBS: Beverly Hills runs its own counter and reviews exterior material changes on the Flats and in the hills. A like-for-like re-side or re-stucco is usually a straightforward permit; a conversion or structural repair is an alteration permit. We pull it, schedule the inspections and close it before the final payment.

Parts of Beverly Hills — the hillside and canyon streets — fall inside a mapped Very High Fire Hazard Severity Zone, where the 2025 California Wildland-Urban Interface Code applies to a re-side: a noncombustible wall covering such as fiber cement, metal or three-coat stucco, or fire-retardant-treated wood, with ember-resistant vents and listed eave and wall-base details. We check your parcel on the CAL FIRE and local fire-zone maps before the material is chosen; on the flats the standard rules apply.

Sources: 2025 California Wildland-Urban Interface Code (Title 24, Part 7), effective January 1, 2026, which replaced Chapter 7A; applies to alterations and repairs in Fire Hazard Severity Zones; coatings are not an approved method of protection (read); CAL FIRE Office of the State Fire Marshal: Fire Hazard Severity Zone maps and the Wildland-Urban Interface building materials listing (maps).

What We Do in Beverly Hills

Every Siding Service,
One Licensed Crew

01

Full siding replacement

Tear-off, dry-rot and sheathing repair, new weather-resistive barrier, flashing at every window, door, deck ledger and corner, new siding, trim and caulking, ready for paint.

02

Siding and stucco repair

Cracked stucco, soft boards, termite and woodpecker damage, rot at the base of a wall, failed caulking: matched, flashed and finished so the repair disappears.

03

Re-stucco and re-coat

Three-coat re-stucco over new paper and lath, one-coat systems, or a patch-and-re-coat with a new color or elastomeric finish; smooth and textured.

04

Conversions

Stucco to fiber cement or wood siding, or siding to stucco, with the flashing and structural details each direction needs, permitted as an alteration.

05

Fire-zone exteriors

Noncombustible fiber cement, metal or three-coat stucco, or treated wood, with ember-resistant vents, built to the 2025 California Wildland-Urban Interface Code where Beverly Hills parcels fall inside a fire-hazard zone.

06

What is behind the wall

The rotted stud, the failed window flashing or the deck ledger we uncover is repaired under the same contract and permit, not referred out.

How It Works

Three Steps.
Zero Surprises.

01

Free Exterior Assessment

We walk every elevation, probe for rot and check the barrier, flashing and weep screed, and tell you honestly what the wall needs.

02

Fixed-Price Proposal

An itemized fixed price by elevation and material within 3–5 business days; hidden rot found at tear-off is priced in writing before the crew continues.

03

Install, Inspect, Warrant

Our own crew, a closed permit, and a 10-year written workmanship warranty at completion.

Free Estimate

Free Siding Estimate
in Beverly Hills

Tell us about the house and what you are seeing on the walls; a senior member of our team will reach out within 4 business hours to schedule the on-site assessment in Beverly Hills.

Prefer to talk it through?

(818) 210-4544
✓
Request Received
Thank you — a senior member of our team will reach out within 4 business hours. For anything urgent, call (818) 210-4544.

Your information is kept private and never shared. Privacy Policy

Beverly Hills Siding FAQ

Questions Beverly Hills Homeowners
Ask About Siding

Yes. Our own crew installs fiber cement, engineered and natural wood, metal and vinyl, and does stucco from a patch-and-re-coat to a full three-coat re-stucco, plus stucco-to-siding and siding-to-stucco conversions. In Beverly Hills that matters because so many houses mix the two, stucco below with wood or board-and-batten above, and the flashing between them is where the leaks start.

We do, through the City of Beverly Hills Building & Safety Division, not LADBS. A straightforward re-side or re-stucco is a simple permit; a conversion or a wall with framing repair is an alteration permit with an inspection before the finish goes on. The permit is closed before your final payment.

Two to four weeks on site for a typical single-story Beverly Hills house: a few days of tear-off and repair, a few days for barrier and flashing, then the siding or the stucco coats, which need their cure time between coats. Two-story and hillside houses run four to six weeks because every elevation is scaffolded; our Calabasas project ran six.

Four things: an active CSLB license you can verify online (ours is #1021284, General Building B), proof of liability and workers' compensation insurance, a written workmanship warranty with a term on it (ours is ten years), and a written scope that names the weather barrier, the flashing and who pulls the permit. If a bid in Beverly Hills does not mention the barrier, it is a bid to cover the problem, not fix it.

Not without your written approval. The fixed price covers the scope we agreed, the City of Beverly Hills Building and Safety Division permit and the inspections; if the house in Beverly Hills hides a problem, you get a written, priced change order before the crew touches it, and the final payment is only due after your walkthrough. Current planning ranges are in the siding cost guide.

CallFree Estimate