Pacific Palisades is part of the City of Los Angeles, so plan review, permitting and inspection run through the Los Angeles Department of Building and Safety, from the West Los Angeles Development Services Center, 1828 Sawtelle Boulevard. A like-for-like re-side or re-stucco over sound sheathing is a counter permit; a stucco-to-siding conversion or a wall that needs framing repair is an alteration permit with plan check.
Pacific Palisades is part of the City of Los Angeles. Parcels in the Coastal Zone add a coastal review, the canyon and hillside streets fall under the Baseline Hillside Ordinance, and houses being rebuilt after the January 2025 fire run through the One-Stop Rebuilding Center, at Sawtelle Boulevard and, since February 2026, the Palisades satellite at 16925 Marquez Avenue, where LADBS, City Planning, the Fire Department and DWP sit at one counter.
We prepare whichever review comes first, submit the permit, schedule the inspections, meet the inspector at the flashing stage and at the final, and close the permit before the final payment. You keep the closed-permit record.
Sources, checked October 27, 2026: City of Los Angeles, Palisades rebuild permit center (February 2026); Office of the Mayor, One-Stop Rebuilding Center and expedited permitting; California Building Code Chapter 7A and the Office of the State Fire Marshal WUI product listings.