Fiber cement siding by Right Image Builders: finished James Hardie lap siding on a three-level hillside house after a full tear-off
Licensed & Insured · CSLB #1021284 · Since 2016 · 10-Year Written Workmanship Warranty

Siding Contractor in Bradbury, CA

Fiber cement, stucco, wood and conversions on 1950s–80s ranch estates on acre lots behind the Bradbury Estates, replaced or repaired by one licensed, insured general contractor, with the dry rot and flashing behind the wall fixed under the same City of Bradbury permit, one fixed written price and a 10-year written workmanship warranty.

Professional, licensed & insuredFixed-price proposalsPermits & reviews handledOur own crew, not subs

Get a Free Siding Estimate

Tell us about the house. We call back to schedule the on-site estimate in Bradbury.

Please enter your name.
Please enter a valid 10-digit phone number.
That email does not look right. Leave it blank if you prefer.

Your details stay with us. Only used to reach you about your house.

By submitting, you agree that Right Image Builders may contact you by phone, text or email about your project, including by automated means. Consent is not a condition of purchase. Message and data rates may apply. See our Privacy Policy and SMS Terms.

Request received.

Thanks. We will call you to set up the free on-site estimate in Bradbury.

Call now · (818) 210-4544
5.0★Google · 45 reviews
57+Permitted projects
12+Years experience · CSLB #1021284
10-yrWritten workmanship warranty

Siding contractor in Bradbury, CA: Right Image Builders (CSLB #1021284, licensed and insured since 2016) replaces and repairs siding and stucco on 1950s–80s ranch estates on acre lots behind the Bradbury Estates and Woodlyn Lane gates, equestrian properties, and 1950s ranch houses on the flats near Royal Oaks Drive across the Royal Oaks flats and the Mount Olive foothill, with the dry rot, sheathing and flashing behind the wall repaired by the same crew on the same City of Bradbury permit.

Fiber cement (James Hardie and similar), three-coat re-stucco and stucco repair, wood and engineered wood, stucco-to-siding conversions; the foothill and canyon parcels north of Royal Oaks Drive are mapped Very High; the flats mostly are not; cladding fastened to the wind schedule for the Santa Ana corridor. Two to four weeks on site for a single-storey house, four to six for two-storey and hillside houses; one fixed written price after a free on-site estimate; 10-year written workmanship warranty. Office in Valley Glen.

Updated October 2026 · Right Image Builders project team · CSLB #1021284 · 5.0★ Google (45 reviews) · 4.9★ Angi (103 reviews)

Local siding experts

What Bradbury Walls Are Made Of

Bradbury is a few hundred houses on big lots at the foot of the San Gabriels: ranch estates from the 1950s–80s behind the Bradbury Estates and Woodlyn Lane gates, horse properties with barns and guest houses, and 1950s ranch houses on the flats near Royal Oaks Drive. The walls are long and low, wood or stucco, running down to planters and paddocks where the sprinklers hit them every morning, and the barns have to match the house.

The City is small and its process is particular: the building inspector keeps morning counter hours three days a week, plans go to Architectural Design Review before plan check on most exterior work, and the gated communities add their own review. We prepare the design review submittal with samples and elevations, then the permit, and we schedule inspections around the counter days so the job does not wait.

The foothill parcels north of Royal Oaks are a Very High Fire Hazard Severity Zone, where Chapter 7A settles the cladding: fiber cement, stucco or listed fire-retardant-treated wood, with ember-resistant vents. Wind comes down the canyons in the autumn, so the barrier and the fastening schedule matter on the north and east walls.

Siding replacement by Right Image Builders: the finished hillside elevation of a fiber cement job seen from the canyon side
Where siding actually fails

Six places the water gets in. Tap each one.

Almost never in the middle of the wall. Always at an opening, an edge or the base. This is what we open and look at before we price.

GRADE / PLANTER DECK LEDGER 1 2 3 4 5 6
  • 1
    Window and door headsNo head flashing, or paper lapped the wrong way over it, and every rain runs behind the cladding at the top of the opening.
  • 2
    The base of the wallA weep screed buried in soil, siding touching the slab or the planter: the bottom course wicks and the sill plate goes soft.
  • 3
    Inside and outside cornersCorner boards and stucco corners that were never flashed behind, so the two walls drain into each other.
  • 4
    Hose bibs, vents and penetrationsEvery pipe and vent is a hole in the barrier; caulked and hoped for, instead of flashed.
  • 5
    The deck ledgerSiding run over the ledger where the deck bolts to the house: the one place water has to get out, sealed in.
  • 6
    Parapets, pop-outs and foam trimCaps that were never flashed and foam mitres that opened in the second summer, letting water behind the stucco.
Our services in Bradbury

Siding Services We Provide in Bradbury

A licensed, insured general contractor, not a siding installer: the framing behind the wall, the barrier and flashing, and the cladding, under one permit and one contract.

Fiber cement siding: James Hardie lap siding finished and painted at an outside corner

Fiber Cement Siding in Bradbury

James Hardie, Allura and similar lap, panel and shingle, in the climate-rated grade for Southern California, factory-finished or painted on site, over a lapped and taped weather-resistive barrier with every opening flashed. Noncombustible, so it is the usual answer in the fire zones.

Get a free estimate
A whole elevation wrapped in weather-resistive barrier, ready for lath or siding

Re-Stucco & Stucco Repair in Bradbury

Three-coat stucco over new paper and lath where the old coat has let go, floated and textured to match the house; crack, patch and parapet repair where the field is sound; the weep screed and base flashing replaced where the soil has buried them.

Get a free estimate
Weathered wood siding on a hillside house before replacement

Wood & Engineered Wood Siding

Cedar, redwood and engineered wood lap, board-and-batten and shingle, profile-matched to the original on Craftsman and ranch houses; listed fire-retardant-treated wood where the parcel sits in a Very High Fire Hazard Severity Zone.

Get a free estimate
Full tear-off to the sheathing and studs on a street-facing elevation, scaffolding on the slope

Stucco-to-Siding & Siding-to-Stucco

Full tear-off to the sheathing, framing and sheathing repaired, new barrier and flashing, then the new cladding; the conversion is permitted as an alteration and we handle the design-review or HOA submittal where there is one.

Get a free estimate
Siding tear-off: framing and sheathing exposed and checked for dry rot before the new weather barrier

Dry Rot, Sheathing & Flashing Repair

Because we are a general contractor, the soft sill plate, the rotted sheathing, the missing window head flashing or the deck ledger that was sided over is repaired under the same permit and the same contract, not referred to someone else.

Get a free estimate
Fire-zone siding job: new insulation in the open bays of a garage gable before the wrap went on

Fire-Zone (Chapter 7A) Exteriors

In the Very High Fire Hazard Severity Zones the cladding has to be noncombustible or ignition-resistant and the vents ember-resistant; we specify from the State Fire Marshal listings and detail the eaves and trim to match, so the inspection passes the first time.

Get a free estimate
How we work with you

Transparent from the first visit to the closed permit.

Professional, licensed and insured, and we put that in writing at every step, because re-siding a house is a trust decision before it is a construction decision.

Licensed and insured, verifiable

California general contractor license CSLB #1021284 (General Building B), active since 2016, with general liability and workers' compensation insurance. Check the license yourself at cslb.ca.gov before you sign anything, with us or anyone else.

A written scope before a dollar changes hands

The proposal lists what comes off, what gets repaired, how the wall is flashed, which cladding goes on and which permit and reviews cover it. If it is not written down, it is not in the job.

Photos of what we find, before we continue

When the old siding or stucco comes off we photograph the sheathing and framing and send you the pictures. Anything beyond the scope is priced in writing before the crew continues. You never find out from the invoice.

The deposit rule, in your favor

California law caps a home-improvement deposit at $1,000 or 10 percent of the contract, whichever is less. We follow it. Progress payments follow the work, and the final payment comes after your walkthrough.

Permits and reviews handled in your name

We prepare the design-review, HOA or Art Jury submittal where the city has one, pull the permit, meet the inspector and close it. You get the closed-permit record a buyer or an insurer will ask for.

One licensed crew, one phone number

The people who inspect the wall are the people who re-clad it. No subcontractor hand-offs, no call center; your project lead answers the phone during the job and after it.

The wall, layer by layer

Six layers. The siding is the last one.

Every wall we re-clad is built the same way from the framing out, to the manufacturer’s written specification and the code for the parcel. Skip a layer and the warranty means nothing.

01
Sheathing and framing, repairedSoft sills, rotted sheathing and the studs behind them replaced first; the wall is only as good as what it is nailed to.
02
Weather-resistive barrierLapped shingle-fashion and taped, turned into every opening, the layer that actually keeps the water out.
03
Flashing at every opening and penetrationHead flashing, sill pans, corner, base and ledger flashing, in corrosion-resistant metal near the coast.
04
Rainscreen or lathA drainage gap behind siding; paper and lath behind stucco; the path water takes to get back out.
05
The claddingFiber cement, stucco, wood or engineered wood, fastened to the manufacturer's schedule for wind and the zone.
06
Trim, sealant and finishTrim flashed at every joint, sealant chosen for UV and movement, finish applied to the manufacturer's spec so the warranty means something.
Weather-resistive barrier taped around an arched entry window before the fiber cement siding went on
The detail that decides itWeather-resistive barrier lapped and taped into the arched window opening before the cladding, so the head and jambs drain out, not in. Caulk alone is not flashing.
Rear elevation with the siding removed around the deck ledgers so the flashing could be done right
The place every hillside house leaksSiding stopped at the deck ledgers and the ledgers flashed before the new boards went on: the one place every hillside house leaks, done while the wall was open.
Recent work

Drag to see before and after.

After siding replacement: fiber cement lap siding finished and painted, stucco base kept, corners trimmed Before siding replacement: weathered wood siding on a three-level hillside house, felt paper exposed where boards had failed BeforeAfter

From our Calabasas hillside project: weathered wood siding to painted James Hardie fiber cement, full tear-off, six weeks on the slope. Two photographs from different spots on the hillside; drag the handle.

Permits, reviews & inspections

Pulling a Siding Permit in Bradbury

Bradbury issues its own permits: siding and stucco work goes through the City of Bradbury Building Department at City Hall, 600 Winston Avenue, where the building inspector keeps counter hours on Tuesday to Thursday mornings and plans go to the Planning Department for Architectural Design Review before plan check, not LADBS. A like-for-like re-side or re-stucco is a simpler permit than a conversion or a wall that needs framing repair, which goes to plan check.

Architectural Design Review comes before the building permit on most exterior work in Bradbury; the Bradbury Estates and Woodlyn Lane gates add their own association review, and the foothill parcels north of Royal Oaks are a Very High Fire Hazard Severity Zone.

We prepare whichever review comes first, submit the permit, schedule the inspections, meet the inspector at the flashing stage and at the final, and close the permit before the final payment. You keep the closed-permit record.

Sources, checked October 27, 2026: City of Bradbury, Building and Safety (permits for siding, design review, inspector hours); California Building Code Chapter 7A and the Office of the State Fire Marshal WUI product listings; CAL FIRE Fire Hazard Severity Zone maps (2025 local-responsibility-area update).

Common issues we fix

Siding Problems We Solve in Bradbury

  • Long ranch-house walls with wood siding at grade along planters and paddocksBottom courses and sills opened, sheathing replaced where soft, base flashing and clearance to grade built in, then new wood or fiber cement fastened to the wind schedule.
  • Estate stucco with cracked parapets and failed foam trimParapet caps rebuilt and flashed, trim removed and the wall behind repaired, re-floated to match; a re-stucco where the paper has failed.
  • Barns, stables and guest houses that must match the main house for design reviewSided in the same material, profile and colour, in the same design review submittal, under the same permit.
  • Siding or stucco that looks fine from the street but is soft at the bottomThe base of the wall opened and checked at the estimate; a test section decides between repair and tear-off before anything is priced.
  • Windows and doors with no head flashing behind the claddingFlashed properly as part of the re-side, which is the moment the wall is open and it can be done right.
  • Trim, fascia and eaves failing while the field holdsReplaced in kind or in fiber cement and composite profiles, primed on all sides and flashed at every joint.
Fire zones, ocean air & the exterior code

What the code and the climate ask of a Bradbury wall.

Two things decide the material before taste does: whether the parcel is in a Very High Fire Hazard Severity Zone, and how close it is to the ocean. The rest is what is behind the cladding.

Chapter 7A · Very High Fire Hazard Severity ZonesIgnition-resistant

Exterior walls have to be noncombustible or ignition-resistant: fiber cement, three-coat stucco, listed fire-retardant-treated wood or an assembly tested to the State Fire Marshal standard, with ember-resistant vents and the eaves and trim detailed to match.

Near the oceanCorrosion-resistant

Within reach of the salt air the fasteners, flashing, screed and vents fail before the field does. Manufacturers call for hot-dip galvanized or stainless metal by distance from the water; we specify it for the parcel, not from a catalogue.

What we do with itCheck. Specify. Permit.

We look the parcel up on the CAL FIRE and city maps at the estimate, write the material and the fastening into the scope, prepare any design-review or HOA submittal, and pull the permit that matches. The foothill and canyon parcels north of Royal Oaks Drive are mapped Very High; the flats mostly are not.

What does your wall need? Three questions.

Very High Fire Hazard Severity Zone?
Within about a mile of the ocean?
What is on the wall now?
Answer the three questionsWe will tell you what the code and the climate ask of the wall.

Sources: California Building Code Chapter 7A and the Office of the State Fire Marshal WUI product listings; CAL FIRE Fire Hazard Severity Zone maps (2025 update); manufacturer installation guides for coastal fastening; the city and county pages cited above. Checked October 2026. Confirm the zone for your parcel with the city or county.

What clients say
  • ★★★★★
    Honest, straightforward, and clear. The team was so professional, respectful, and clean. Everything was as planned and within the timeline.Zachary R. · Google
  • ★★★★★
    The fixed-price contract was exactly what we needed. No surprise invoices, no scope creep. The owner personally showed up to every major milestone.David & Sarah K. · Houzz
  • ★★★★★
    Prompt, thorough, and responsive. The price was very fair unlike three other contractors I requested bids from.Sherry C. · Yelp
Why choose us

Why Bradbury Trusts Right Image Builders

Licensed & Insured General Contractor

CSLB #1021284, licensed and insured since 2016. Framing repair, flashing and cladding on one license, one permit, one contract.

Fixed Price, In Writing

One itemized price after the estimate. Hidden conditions photographed and priced in writing before the crew continues.

10-Year Written Workmanship Warranty

In the contract, handed over with the closed permit. Manufacturer warranties registered in your name where offered.

Free On-Site Estimates

At the house in Bradbury, with the base of the wall checked and a test section opened, not a quote from the driveway.

FAQ

Siding in Bradbury: Your Questions

On most exterior work, yes: plans go to the Planning Department for Architectural Design Review before the Building Department's plan check, and the Bradbury Estates and Woodlyn Lane associations review material and colour as well. We prepare the submittal with samples and elevations, then pull the permit once it is approved.

The City of Bradbury Building Department at City Hall on Winston Avenue, which lists siding among the work that needs a permit; the inspector keeps counter hours Tuesday to Thursday mornings, so we schedule inspections around them. We pull it, meet the inspections and close it before the final payment.

The foothill and canyon parcels north of Royal Oaks Drive are mapped Very High; the flats mostly are not. We check the parcel on the CAL FIRE map at the estimate. In the zone, Chapter 7A requires noncombustible or ignition-resistant cladding, fiber cement, stucco or listed fire-retardant-treated wood, with ember-resistant vents.

Yes. Right Image Builders, Inc. holds California general contractor license CSLB #1021284 (General Building B), active since 2016, with general liability and workers' compensation insurance. Verify the license at cslb.ca.gov and ask us for the insurance certificates; we expect you to.

Usually whichever the house already has, done properly: a re-stucco over new paper and lath on a stucco house, fiber cement or wood on a sided house, because the look, the trim and the neighbours are already set. A conversion makes sense when the owner wants the other look or the existing wall has to come off anyway. We open a test section at the estimate and recommend from what is behind the wall, not from a catalogue.

Two to four weeks on site for a single-storey house and four to six for a two-storey or hillside house that needs scaffolding on every elevation, after the permit and any design review are in hand. The schedule is written before the first day and the house is kept weather-tight between elevations.

Everything the estimate scoped: tear-off, the repairs we can see, the weather-resistive barrier, flashing, the cladding, trim and finish where scoped, the permit, the inspections and any design-review submittal. Anything uncovered at tear-off is photographed and priced in writing before the crew continues, and the final payment comes after your walkthrough. No surprise invoices.

Free Siding Estimate in Bradbury

Fix the wall before the next rain. One licensed, insured crew, one fixed written price, the permit closed, a 10-year written warranty.