Fiber cement siding by Right Image Builders: finished James Hardie lap siding on a three-level hillside house after a full tear-off
Licensed & Insured · CSLB #1021284 · Since 2016 · 10-Year Written Workmanship Warranty

Siding Contractor in Westlake Village, CA

Fiber cement, stucco, wood and conversions on 1970s–90s stucco houses in First Neighborhood, Three Springs and the lakefront tracts, and custom hillside houses off Lindero Canyon Road, replaced or repaired by one licensed, insured general contractor, with the dry rot and flashing behind the wall fixed under the same LA County permit, one fixed written price and a 10-year written workmanship warranty.

Professional, licensed & insuredFixed-price proposalsPermits & reviews handledOur own crew, not subs

Get a Free Siding Estimate

Tell us about the house. We call back to schedule the on-site estimate in Westlake Village.

Please enter your name.
Please enter a valid 10-digit phone number.
That email does not look right. Leave it blank if you prefer.

Your details stay with us. Only used to reach you about your house.

By submitting, you agree that Right Image Builders may contact you by phone, text or email about your project, including by automated means. Consent is not a condition of purchase. Message and data rates may apply. See our Privacy Policy and SMS Terms.

Request received.

Thanks. We will call you to set up the free on-site estimate in Westlake Village.

Call now · (818) 210-4544
5.0★Google · 45 reviews
57+Permitted projects
12+Years experience · CSLB #1021284
10-yrWritten workmanship warranty

Siding contractor in Westlake Village, CA: Right Image Builders (CSLB #1021284, licensed and insured since 2016) replaces and repairs siding and stucco on 1970s–90s stucco houses in First Neighborhood, Three Springs and the lakefront tracts, and custom hillside houses off Lindero Canyon Road across the Westlake Island and lakefront tracts and the hillside streets off Lindero Canyon, with the dry rot, sheathing and flashing behind the wall repaired by the same crew on the same LA County permit.

Fiber cement (James Hardie and similar), three-coat re-stucco and stucco repair, wood and engineered wood, stucco-to-siding conversions; the hillside tracts toward the Santa Monica Mountains are mapped Very High; the lake-side flats mostly are not; finishes and sealants chosen for sun and movement. Two to four weeks on site for a single-storey house, four to six for two-storey and hillside houses; one fixed written price after a free on-site estimate; 10-year written workmanship warranty. Office in Valley Glen.

Updated October 2026 · Right Image Builders project team · CSLB #1021284 · 5.0★ Google (45 reviews) · 4.9★ Angi (103 reviews)

Local siding experts

What Westlake Village Walls Are Made Of

Westlake Village is a planned community from the late 1960s onward, which means its stucco all aged together: First Neighborhood, Three Springs and the lakefront tracts have the same control joints opening, the same foam trim letting water in at the mitres, and the same wood fascia, shutters and trim failing while the stucco field looks fine. On the lake the walls that face the water stain and stay damp at the base; on the hillside streets off Lindero Canyon the sun and the wind do the work.

The jurisdiction is the thing to get right first. The City contracts with Los Angeles County for building and safety, so the permit, the inspections and the records are the County's, from the Calabasas office, after a zoning clearance from the City; and the Ventura County side of Westlake Boulevard, with the same postal address, is Thousand Oaks and a different counter altogether. We confirm the parcel before we price.

The hillside tracts are in the Very High Fire Hazard Severity Zone, where Chapter 7A settles the cladding: fiber cement, stucco or listed fire-retardant-treated wood. The HOAs review material and colour on most streets, so one specification and one sample board goes to the board before anything goes to the County.

Siding replacement by Right Image Builders: the finished hillside elevation of a fiber cement job seen from the canyon side
Where siding actually fails

Six places the water gets in. Tap each one.

Almost never in the middle of the wall. Always at an opening, an edge or the base. This is what we open and look at before we price.

GRADE / PLANTER DECK LEDGER 1 2 3 4 5 6
  • 1
    Window and door headsNo head flashing, or paper lapped the wrong way over it, and every rain runs behind the cladding at the top of the opening.
  • 2
    The base of the wallA weep screed buried in soil, siding touching the slab or the planter: the bottom course wicks and the sill plate goes soft.
  • 3
    Inside and outside cornersCorner boards and stucco corners that were never flashed behind, so the two walls drain into each other.
  • 4
    Hose bibs, vents and penetrationsEvery pipe and vent is a hole in the barrier; caulked and hoped for, instead of flashed.
  • 5
    The deck ledgerSiding run over the ledger where the deck bolts to the house: the one place water has to get out, sealed in.
  • 6
    Parapets, pop-outs and foam trimCaps that were never flashed and foam mitres that opened in the second summer, letting water behind the stucco.
Our services in Westlake Village

Siding Services We Provide in Westlake Village

A licensed, insured general contractor, not a siding installer: the framing behind the wall, the barrier and flashing, and the cladding, under one permit and one contract.

Fiber cement siding: James Hardie lap siding finished and painted at an outside corner

Fiber Cement Siding in Westlake Village

James Hardie, Allura and similar lap, panel and shingle, in the climate-rated grade for Southern California, factory-finished or painted on site, over a lapped and taped weather-resistive barrier with every opening flashed. Noncombustible, so it is the usual answer in the fire zones.

Get a free estimate
A whole elevation wrapped in weather-resistive barrier, ready for lath or siding

Re-Stucco & Stucco Repair in Westlake Village

Three-coat stucco over new paper and lath where the old coat has let go, floated and textured to match the house; crack, patch and parapet repair where the field is sound; the weep screed and base flashing replaced where the soil has buried them.

Get a free estimate
Weathered wood siding on a hillside house before replacement

Wood & Engineered Wood Siding

Cedar, redwood and engineered wood lap, board-and-batten and shingle, profile-matched to the original on Craftsman and ranch houses; listed fire-retardant-treated wood where the parcel sits in a Very High Fire Hazard Severity Zone.

Get a free estimate
Full tear-off to the sheathing and studs on a street-facing elevation, scaffolding on the slope

Stucco-to-Siding & Siding-to-Stucco

Full tear-off to the sheathing, framing and sheathing repaired, new barrier and flashing, then the new cladding; the conversion is permitted as an alteration and we handle the design-review or HOA submittal where there is one.

Get a free estimate
Siding tear-off: framing and sheathing exposed and checked for dry rot before the new weather barrier

Dry Rot, Sheathing & Flashing Repair

Because we are a general contractor, the soft sill plate, the rotted sheathing, the missing window head flashing or the deck ledger that was sided over is repaired under the same permit and the same contract, not referred to someone else.

Get a free estimate
Fire-zone siding job: new insulation in the open bays of a garage gable before the wrap went on

Fire-Zone (Chapter 7A) Exteriors

In the Very High Fire Hazard Severity Zones the cladding has to be noncombustible or ignition-resistant and the vents ember-resistant; we specify from the State Fire Marshal listings and detail the eaves and trim to match, so the inspection passes the first time.

Get a free estimate
How we work with you

Transparent from the first visit to the closed permit.

Professional, licensed and insured, and we put that in writing at every step, because re-siding a house is a trust decision before it is a construction decision.

Licensed and insured, verifiable

California general contractor license CSLB #1021284 (General Building B), active since 2016, with general liability and workers' compensation insurance. Check the license yourself at cslb.ca.gov before you sign anything, with us or anyone else.

A written scope before a dollar changes hands

The proposal lists what comes off, what gets repaired, how the wall is flashed, which cladding goes on and which permit and reviews cover it. If it is not written down, it is not in the job.

Photos of what we find, before we continue

When the old siding or stucco comes off we photograph the sheathing and framing and send you the pictures. Anything beyond the scope is priced in writing before the crew continues. You never find out from the invoice.

The deposit rule, in your favor

California law caps a home-improvement deposit at $1,000 or 10 percent of the contract, whichever is less. We follow it. Progress payments follow the work, and the final payment comes after your walkthrough.

Permits and reviews handled in your name

We prepare the design-review, HOA or Art Jury submittal where the city has one, pull the permit, meet the inspector and close it. You get the closed-permit record a buyer or an insurer will ask for.

One licensed crew, one phone number

The people who inspect the wall are the people who re-clad it. No subcontractor hand-offs, no call center; your project lead answers the phone during the job and after it.

The wall, layer by layer

Six layers. The siding is the last one.

Every wall we re-clad is built the same way from the framing out, to the manufacturer’s written specification and the code for the parcel. Skip a layer and the warranty means nothing.

01
Sheathing and framing, repairedSoft sills, rotted sheathing and the studs behind them replaced first; the wall is only as good as what it is nailed to.
02
Weather-resistive barrierLapped shingle-fashion and taped, turned into every opening, the layer that actually keeps the water out.
03
Flashing at every opening and penetrationHead flashing, sill pans, corner, base and ledger flashing, in corrosion-resistant metal near the coast.
04
Rainscreen or lathA drainage gap behind siding; paper and lath behind stucco; the path water takes to get back out.
05
The claddingFiber cement, stucco, wood or engineered wood, fastened to the manufacturer's schedule for wind and the zone.
06
Trim, sealant and finishTrim flashed at every joint, sealant chosen for UV and movement, finish applied to the manufacturer's spec so the warranty means something.
Weather-resistive barrier taped around an arched entry window before the fiber cement siding went on
The detail that decides itWeather-resistive barrier lapped and taped into the arched window opening before the cladding, so the head and jambs drain out, not in. Caulk alone is not flashing.
Rear elevation with the siding removed around the deck ledgers so the flashing could be done right
The place every hillside house leaksSiding stopped at the deck ledgers and the ledgers flashed before the new boards went on: the one place every hillside house leaks, done while the wall was open.
Recent work

Drag to see before and after.

After siding replacement: fiber cement lap siding finished and painted, stucco base kept, corners trimmed Before siding replacement: weathered wood siding on a three-level hillside house, felt paper exposed where boards had failed BeforeAfter

From our Calabasas hillside project: weathered wood siding to painted James Hardie fiber cement, full tear-off, six weeks on the slope. Two photographs from different spots on the hillside; drag the handle.

Permits, reviews & inspections

Pulling a Siding Permit in Westlake Village

Westlake Village has no city building department: the permit comes from Los Angeles County Building and Safety, from the Calabasas District Office of Los Angeles County Building and Safety, 27001 Agoura Road, Suite 250, after a zoning clearance from the City of Westlake Village Planning Department at 31200 Oak Crest Drive, with the application through the County's EPIC-LA portal. A like-for-like re-side or re-stucco is a simpler permit than a conversion or a wall that needs framing repair, which goes to plan check.

Westlake Village contracts with Los Angeles County for building and safety, so the permit, the inspections and the records are the County's while the zoning clearance comes from the City first. The Ventura County side of Westlake Boulevard is the City of Thousand Oaks with a Westlake Village postal address, a different jurisdiction we confirm from the parcel. The lakefront and hillside tracts add HOA review.

We prepare whichever review comes first, submit the permit, schedule the inspections, meet the inspector at the flashing stage and at the final, and close the permit before the final payment. You keep the closed-permit record.

Sources, checked October 27, 2026: City of Westlake Village, Building and Safety (County contract, EPIC-LA); Los Angeles County Public Works, Building and Safety office locator (Calabasas and Lomita district offices); California Building Code Chapter 7A and the Office of the State Fire Marshal WUI product listings.

Common issues we fix

Siding Problems We Solve in Westlake Village

  • Stucco cracking and staining on lakefront walls that face the waterBase opened and checked, screed and flashing replaced, cracks cut and re-sealed, re-floated with a breathable finish, soil and hardscape regraded to drain.
  • Wood trim, shutters and fascia failing while the stucco lastsReplaced in kind or in fiber cement and composite profiles, primed on all sides, flashed at every joint, in the colour the HOA has approved.
  • HOA tracts that need one matching specification across many housesOne written spec, one sample board, one board approval, then the houses done in sequence so the street stays consistent.
  • Siding or stucco that looks fine from the street but is soft at the bottomThe base of the wall opened and checked at the estimate; a test section decides between repair and tear-off before anything is priced.
  • Windows and doors with no head flashing behind the claddingFlashed properly as part of the re-side, which is the moment the wall is open and it can be done right.
  • Trim, fascia and eaves failing while the field holdsReplaced in kind or in fiber cement and composite profiles, primed on all sides and flashed at every joint.
Fire zones, ocean air & the exterior code

What the code and the climate ask of a Westlake Village wall.

Two things decide the material before taste does: whether the parcel is in a Very High Fire Hazard Severity Zone, and how close it is to the ocean. The rest is what is behind the cladding.

Chapter 7A · Very High Fire Hazard Severity ZonesIgnition-resistant

Exterior walls have to be noncombustible or ignition-resistant: fiber cement, three-coat stucco, listed fire-retardant-treated wood or an assembly tested to the State Fire Marshal standard, with ember-resistant vents and the eaves and trim detailed to match.

Near the oceanCorrosion-resistant

Within reach of the salt air the fasteners, flashing, screed and vents fail before the field does. Manufacturers call for hot-dip galvanized or stainless metal by distance from the water; we specify it for the parcel, not from a catalogue.

What we do with itCheck. Specify. Permit.

We look the parcel up on the CAL FIRE and city maps at the estimate, write the material and the fastening into the scope, prepare any design-review or HOA submittal, and pull the permit that matches. The hillside tracts toward the Santa Monica Mountains are mapped Very High; the lake-side flats mostly are not.

What does your wall need? Three questions.

Very High Fire Hazard Severity Zone?
Within about a mile of the ocean?
What is on the wall now?
Answer the three questionsWe will tell you what the code and the climate ask of the wall.

Sources: California Building Code Chapter 7A and the Office of the State Fire Marshal WUI product listings; CAL FIRE Fire Hazard Severity Zone maps (2025 update); manufacturer installation guides for coastal fastening; the city and county pages cited above. Checked October 2026. Confirm the zone for your parcel with the city or county.

What clients say
  • ★★★★★
    Honest, straightforward, and clear. The team was so professional, respectful, and clean. Everything was as planned and within the timeline.Zachary R. · Google
  • ★★★★★
    The fixed-price contract was exactly what we needed. No surprise invoices, no scope creep. The owner personally showed up to every major milestone.David & Sarah K. · Houzz
  • ★★★★★
    Prompt, thorough, and responsive. The price was very fair unlike three other contractors I requested bids from.Sherry C. · Yelp
Why choose us

Why Westlake Village Trusts Right Image Builders

Licensed & Insured General Contractor

CSLB #1021284, licensed and insured since 2016. Framing repair, flashing and cladding on one license, one permit, one contract.

Fixed Price, In Writing

One itemized price after the estimate. Hidden conditions photographed and priced in writing before the crew continues.

10-Year Written Workmanship Warranty

In the contract, handed over with the closed permit. Manufacturer warranties registered in your name where offered.

Free On-Site Estimates

At the house in Westlake Village, with the base of the wall checked and a test section opened, not a quote from the driveway.

FAQ

Siding in Westlake Village: Your Questions

It depends on which side of the county line the parcel sits. The City of Westlake Village is in Los Angeles County and contracts its building and safety to the County, so permits come from the County's Calabasas office after a City zoning clearance; the Ventura County side of Westlake Boulevard is the City of Thousand Oaks with the same postal address. We confirm the parcel before pricing, because the two counters are not interchangeable.

On most streets, yes: First Neighborhood, Three Springs, the lakefront tracts and the hillside associations review material, profile and colour. We prepare one specification and sample board for the board, keep to the community's guidelines, and apply for the permit once it is approved.

Los Angeles County Building and Safety, from the Calabasas District Office on Agoura Road, through the EPIC-LA portal, after the City of Westlake Village Planning Department has issued a zoning clearance. We pull it, meet the inspections and close it before the final payment.

Yes. Right Image Builders, Inc. holds California general contractor license CSLB #1021284 (General Building B), active since 2016, with general liability and workers' compensation insurance. Verify the license at cslb.ca.gov and ask us for the insurance certificates; we expect you to.

Usually whichever the house already has, done properly: a re-stucco over new paper and lath on a stucco house, fiber cement or wood on a sided house, because the look, the trim and the neighbours are already set. A conversion makes sense when the owner wants the other look or the existing wall has to come off anyway. We open a test section at the estimate and recommend from what is behind the wall, not from a catalogue.

Two to four weeks on site for a single-storey house and four to six for a two-storey or hillside house that needs scaffolding on every elevation, after the permit and any design review are in hand. The schedule is written before the first day and the house is kept weather-tight between elevations.

Everything the estimate scoped: tear-off, the repairs we can see, the weather-resistive barrier, flashing, the cladding, trim and finish where scoped, the permit, the inspections and any design-review submittal. Anything uncovered at tear-off is photographed and priced in writing before the crew continues, and the final payment comes after your walkthrough. No surprise invoices.

Free Siding Estimate in Westlake Village

Fix the wall before the next rain. One licensed, insured crew, one fixed written price, the permit closed, a 10-year written warranty.