Project · Siding · Calabasas

Calabasas Hillside Home: Failing Wood Siding to Fiber Cement, Start to Finish

A three-level house on a canyon slope in a Very High Fire Hazard Severity Zone. The wood siding had reached the end of its life and the walls behind it had rot. Here is what the job involved, photo by photo.

By Right Image Builders · Los Angeles General Contractor · CSLB #1021284Completed 2026 · Published October 19, 2026

Project: full siding replacement on a three-level hillside home in Calabasas. Scope: tear-off of the original wood siding, dry-rot and framing repair, new insulation in the opened bays, new weather-resistive barrier with flashing at every window, deck ledger and corner, James Hardie fiber cement lap siding, paint, plus roof, gutter, window and deck work found along the way. Crew: Right Image Builders' own. Time on site: six weeks. Permit: City of Calabasas. The house sits in a Very High Fire Hazard Severity Zone, where a noncombustible exterior such as fiber cement is the straightforward way to meet the state's wildland-urban interface rules.

Pricing for this project is not published; 2026 planning ranges for fiber cement siding in Los Angeles run $13–$22 per sq ft of wall, compiled from published local pricing. Licensed general contractor, CSLB #1021284, own siding crew, 10-year written workmanship warranty, 5.0★ Google (45 reviews).

Updated October 2026 · Right Image Builders project team · CSLB #1021284 · 5.0★ Google (45 reviews) · 4.9★ Angi (103 reviews)

The Sequence

Before, During
and After

What the Job Involved

Six Weeks
on a Slope

01

Scaffold the slope

Three levels of cantilevered balconies on a canyon lot: every elevation needed scaffolding before a board could come off, and the scaffold stayed for the duration.

02

Tear-off and inspection

The original wood siding and felt paper came off to the sheathing and studs. The garage wall and the base of several walls showed rot and failed paper, which is what the siding had been hiding.

03

Dry rot and framing repair

Rotted framing and sheathing were cut back to sound wood and replaced or sistered, priced in writing before the crew continued, under the same contract.

04

Insulation and house wrap

New insulation went into the opened bays, then a new weather-resistive barrier across every elevation, lapped and taped, with flashing at the windows, the arched entry window, the deck ledgers and the corners.

05

Fiber cement lap siding

James Hardie fiber cement lap siding installed to the manufacturer's instructions over the new barrier, trimmed at corners and openings, then primed and painted; the stucco base of the house stayed.

06

The rest of the exterior

Roof and gutter work, and window and deck repairs uncovered during the job, were handled by the same crew so the house was finished once, not in pieces.

Why fiber cement on this house

Calabasas is inside a Very High Fire Hazard Severity Zone, and from January 1, 2026 the California Wildland-Urban Interface Code (which replaced Chapter 7A) applies to exterior alterations there. Fiber cement is a noncombustible wall covering, so it meets that rule without a special assembly, and it does not feed termites or dry out in the canyon sun the way the old wood had. For a hillside house with wood trim, decks and a mountain view, a lap profile kept the look the owners wanted.

What the siding had been hiding

The street view before the job showed tired boards; the tear-off showed why they were tired. Failed felt paper, rot at the base of the walls and around the garage, and deck ledgers that had been sided over without flashing. None of that could be fixed by new boards over old paper, which is the reason we strip every re-side to the sheathing and repair before we wrap.

What a hillside adds

Scaffolding on all elevations, material carried up by hand, and a schedule that follows the sun and the weather on a slope. The job ran six weeks against the 2–4 weeks a flat single-story house takes. The owners stayed in the house throughout; the work is outside the living space.

Planning a similar project

Fiber cement lap siding in Los Angeles runs $13–$22 per sq ft of wall in 2026 planning ranges compiled from published local pricing, about $23.5K–$39.5K for a typical 1,800 sq ft of wall, with two-story and hillside scaffolding, rot repairs and paint on top. The free on-site assessment measures the house and probes the walls so the fixed price includes what the siding is hiding. See fiber cement siding, siding replacement across Los Angeles and the fire-zone siding guide.

Planning a Project?

Planning a Re-Side?
Start With the Walls

Free on-site assessment across the San Fernando Valley, the Westside and the foothill cities: we probe the walls, measure the house and put a fixed price in writing.

(818) 210-4544
✓
Request Received
Thank you — a senior member of our team will reach out within 4 business hours. For anything urgent, call (818) 210-4544.

Your information is kept private and never shared. Privacy Policy

CallFree Estimate