Commercial Contractor · Van Nuys, CA

Commercial Contractor in Van Nuys, CA

Tenant improvements, restaurant build-outs and office, retail and medical renovations in Van Nuys, permitted through LADBS, built under one fixed-price contract tied to your opening date.

Professional, licensed & insured Fixed-price proposals Permits pulled & closed Our own crew, not subs

5.0★Google · 45 reviews
57+Permitted projects
12+Years experience · CSLB #1021284
FreeOn-site estimate · fixed written price

Commercial contractor in Van Nuys, CA: Right Image Builders (CSLB #1021284) builds office, retail, restaurant and medical tenant improvements across Van Nuys Boulevard, the Civic Center, Sepulveda Boulevard and the light-industrial blocks around Van Nuys Airport, with permits through LADBS at the Van Nuys Development Services Center, restaurant plan check at Los Angeles County Environmental Health and fire review by the Los Angeles Fire Department. Most office and retail tenant improvements of 2,000–5,000 sq ft take 8–14 weeks of construction once the permit is issued; one fixed written proposal after a free site walk.

Licensed general contractor, CSLB #1021284, licensed since 2016, 5.0★ Google (45 reviews), 4.9★ Angi (103 reviews). Office in Valley Glen, about 5 minutes from Van Nuys. How we write a fixed commercial proposal is explained in the fixed-price vs. cost-plus guide.

Updated November 2026 · Right Image Builders project team · CSLB #1021284 · 5.0★ Google (45 reviews) · 4.9★ Angi (103 reviews)

Right Image Builders is a licensed commercial general contractor (CSLB #1021284) serving Van Nuys: Van Nuys Boulevard, the Civic Center, Sepulveda Boulevard and the light-industrial blocks around Van Nuys Airport. We build tenant improvements, restaurant build-outs and office, retail and medical fit-outs with every permit pulled through LADBS at the Van Nuys Development Services Center, on one fixed-price contract with one project manager. Free site walk: (818) 210-4544.

Commercial Work in Van Nuys

The Valley's Working
Downtown

Van Nuys is the Valley's working downtown: the Civic Center with its courthouses and government offices, Van Nuys Boulevard's storefronts, restaurants and professional offices, Sepulveda Boulevard's retail, and the light-industrial, flex and aviation buildings around Van Nuys Airport. Commercial work here ranges from a storefront restaurant or a law office near the courts to a warehouse turned into a showroom, gym or production space, and the warehouse jobs bring their own questions: the change of occupancy, the fire sprinklers and the accessible path from the parking lot.

Three facts decide a Van Nuys build-out before any design. The occupancy: offices and clinics are business occupancies, shops are mercantile, and a restaurant or venue for 50 or more people is an assembly space with stricter exit, restroom and sprinkler rules. The condition of what is already there, from the restroom and the storefront to the electrical service and the HVAC. And the lease, which says what the landlord delivers and what the tenant builds. We read all three at the free site walk and write the scope around them.

Every commercial job in Van Nuys runs on one model: a fixed written proposal after the site walk and the drawings, one project manager who owns the schedule, every trade under our contract and a schedule tied to your opening date. Our office is in Valley Glen, about 5 minutes from Van Nuys. The permit is closed with the final inspection before we hand over the keys.

Request a Free Site Walk
Commercial project Los Angeles — Right Image Builders
Commercial project · Los Angeles, CA
Commercial Services in Van Nuys

Six Commercial Scopes,
One Contract

01

Tenant Improvement (TI)

White box or second-generation space to a move-in-ready suite: partitions, ceilings, HVAC distribution, electrical, Title 24 lighting, restrooms, finishes and a closed permit at turnover.

02

Restaurant Build-Out

Kitchen layout, Type 1 hood and grease duct, make-up air, fire suppression, grease interceptor, walk-ins, bar and dining room, coordinated through the health-department sign-off.

03

Office Renovation & Fit-Out

Re-planned floors, private offices and conference rooms, acoustic walls, data and AV rough-in, dedicated circuits, lighting controls and reception millwork.

04

Retail & Storefront Build-Out

Storefront framing and glazing, display blocking, accent lighting, fitting rooms, point-of-sale rough-in and accessible counters, to your brand standards.

05

Medical & Dental Suites

Exam rooms and operatories with their plumbing and vacuum, sterilization rooms, shielding where equipment needs it, cleanable finishes and HVAC zoning.

06

Building & Common Areas

Lobbies, corridors, restrooms, facades and accessibility upgrades in occupied buildings, phased around tenants and their hours.

How we work with you

Transparent from the first visit to the closed permit.

Professional, licensed and insured, and we put that in writing at every step, because a remodel is a trust decision before it is a construction decision.

Licensed and insured, verifiable

California general contractor license CSLB #1021284 (General Building B), active since 2016, with general liability and workers' compensation insurance. Check the license yourself at cslb.ca.gov before you sign anything, with us or anyone else.

A written scope before a dollar changes hands

The proposal lists what is demolished, what is built, which finishes are included and which permit covers it. If it is not written down, it is not in the job.

Photos of what we find, before we continue

When walls, floors or roofs open up we photograph what is behind them and send you the pictures. Anything beyond the scope is priced in writing before the crew continues. You never find out from the invoice.

The deposit rule, in your favor

California law caps a home-improvement deposit at $1,000 or 10 percent of the contract, whichever is less. We follow it. Progress payments follow the work, and the final payment comes after your walkthrough.

Permits pulled and closed in your name

We submit the plans, meet the inspector and close the permit. You get the closed-permit record, which is what a buyer, an insurer or an appraiser will ask for.

One licensed crew, one phone number

The people who estimate the job are the people who build it. No subcontractor hand-offs, no call center; your project lead answers the phone during the job and after it.

How We Price

How We Price a Build-Out
in Van Nuys

Every commercial project in Van Nuys gets one fixed, written proposal after a free site walk: we measure the space, read the lease exhibit for landlord and tenant work, check what LADBS and the fire and health reviews will require, and price the whole scope before you sign.

What moves the number is the scope, the condition of the existing space and the finish level, never a surprise invoice: anything found behind the walls or above the ceiling is priced in writing before the crew continues.

Comparing contract types first? The fixed-price vs. cost-plus guide explains how a fixed proposal differs from cost-plus.

Permits in Van Nuys

Permits and Approvals
in Van Nuys

Van Nuys is in the City of Los Angeles, so commercial plans are reviewed by LADBS at the Van Nuys Development Services Center, 6262 Van Nuys Boulevard. A restaurant or small-business job can enroll in the LADBS Restaurant & Small Business Express Program, which assigns a case manager who coordinates with City Planning, the Fire Department, LA Sanitation and County Environmental Health. Sprinkler, alarm and hood-suppression work is reviewed by the Los Angeles Fire Department, and every new or remodeled food business is evaluated by LA Sanitation for a grease trap or interceptor.

Turning a warehouse or industrial bay into a showroom, gym, restaurant or office is a change of occupancy, which brings the space up to the code for the new use: exits, restroom count, fire sprinklers and accessibility. That is the first thing we check on a Van Nuys flex building, before any layout is drawn, because it decides the budget and the schedule. The LADBS Van Nuys Development Services Center that reviews the plans is on Van Nuys Boulevard itself.

A restaurant, cafe or bar in Van Nuys also needs a plan check at the Los Angeles County Department of Public Health, Environmental Health, before construction starts: the kitchen layout, finishes, hand and prep sinks, the grease interceptor and the Type 1 hood with its fire-suppression system are reviewed, and the health permit to operate follows the final inspection. We sequence that review with the building and fire approvals so the opening date holds.

Any permitted alteration also brings California's accessibility rules for the path of travel to the altered area: below the state's annually adjusted valuation threshold, the required upgrades to the entrance, restrooms, drinking fountains and signage are capped at 20 percent of the construction cost, and above it full compliance is required unless the building official grants a hardship. Title 24 adds the energy rules for lighting, controls and HVAC, with acceptance tests documented before final.

Recent Projects
How It Works

Three Steps.
Zero Surprises.

01

Site Walk & Scope

We walk the space with you, assess existing conditions, review the lease exhibit for landlord work vs. tenant work, identify permit triggers, and give you an honest scope and budget range before any design work begins.

02

Design, Permit & Fixed Price

We coordinate construction documents, submit for commercial permit, manage plan check, and deliver a fixed-price contract with a schedule tied to your opening date — before a single wall comes down.

03

Build & Open On Time

One project manager runs the job. All trades are coordinated under our contract. We hand you a move-in-ready space with a closed permit and all final inspections signed off — on your schedule.

Commercial FAQ · Van Nuys

Questions From
Van Nuys Businesses

Right Image Builders, a licensed Class B general contractor (CSLB #1021284) based in Valley Glen, about 5 minutes away, builds office, retail, restaurant and medical tenant improvements in Van Nuys, from the site walk and permit drawings through plan check, construction and the final inspection, on one fixed-price contract with one project manager. Free site walk: (818) 210-4544.

Almost always. New walls, plumbing, electrical, HVAC, ceilings with new lighting, storefronts and signs need a permit from LADBS at the Van Nuys Development Services Center; paint, carpet and furniture alone do not. The set includes floor plans, the accessibility path-of-travel plan, Title 24 energy forms and mechanical, electrical and plumbing drawings, and we answer the plan-check corrections and book every inspection.

The occupancy changes, so the space has to meet the code for the new use: enough exits and restrooms for the new occupant load, fire sprinklers and alarms where the new occupancy requires them, an accessible route from parking to the entrance and Title 24 lighting and HVAC. We check the existing building against the new use before design, because that decides the scope.

Three approvals, in the right order: the Los Angeles County Environmental Health plan check of the kitchen, sinks, finishes and hood; the building permit from LADBS at the Van Nuys Development Services Center; and fire review of the hood suppression, sprinklers and alarms by the Los Angeles Fire Department. In the City of Los Angeles, LA Sanitation also evaluates the grease trap or interceptor, and the LADBS Restaurant & Small Business Express Program can assign a case manager.

Plan check typically takes 4–8 weeks for an office or retail set, longer when planning or design review applies. Construction then takes about 8–14 weeks for a typical 2,000–5,000 sq ft office or retail space and 12–20 weeks for a restaurant, depending on the kitchen and the health-department inspections. The schedule in our proposal is tied to your opening date in Van Nuys.

Usually some. Any permitted alteration in Van Nuys triggers California's path-of-travel rule for the route to the altered area: the entrance, restrooms, drinking fountains and signage. Below the state's annually adjusted valuation threshold, those upgrades are capped at 20 percent of the construction cost; above it, full compliance is required unless the building official grants a hardship.

With one fixed, written proposal after a free site walk. We measure the space, read the lease for landlord and tenant work, confirm what LADBS and the fire and health reviews will require, and itemize the whole scope before you sign; anything uncovered during the work in Van Nuys is priced in writing before the crew continues. The fixed-price vs. cost-plus guide explains the difference from cost-plus.

Your Project, Next

Let's Build
Your Business Space

Free site walk in Van Nuys. Permits through LADBS managed. One fixed-price contract tied to your opening date.