Room Addition Permits in Burbank: The City's Own R-1 Rules

Burbank writes its own zoning and runs its own building department, and its single-family rules differ from Los Angeles in almost every number: floor area, height, setbacks and the hillside permit. Here is how they apply to an addition.

By Right Image Builders · Los Angeles General Contractor · CSLB #1021284Published November 17, 2026Updated November 17, 2026
5.0★Google · 45 reviews
57+Permitted projects
12+Years experience · CSLB #1021284
FreeOn-site estimate · fixed written price

A Burbank room addition is permitted by the City of Burbank Building & Safety Division at 150 N. Third Street, not LADBS. On an R-1 lot the house may reach a floor area of 0.4 times the first 7,500 sq ft of lot area plus 0.3 above that, with a 30 ft height limit for pitched roofs, a 15 ft rear setback and side setbacks of 10 percent of lot width; mapped hillside lots may also need a Hillside Development Permit. Design and plan check usually take 2–4 months for a ground-floor addition.

Right Image Builders (CSLB #1021284), a licensed room addition contractor in Burbank, checks the lot against these rules before any drawing.

Updated November 2026 · Right Image Builders project team · CSLB #1021284 · 5.0★ Google (45 reviews) · 4.9★ Angi (103 reviews)

Who issues the permit

Burbank is an independent city. Its Community Development Department, Building & Safety Division, at the Community Services Building, 150 N. Third Street, reviews and issues building permits; Burbank Water and Power handles electrical service upgrades; and Burbank Unified collects school fees, with the city requiring the district's receipt before it issues the permit. Los Angeles rules such as the Baseline Mansionization Ordinance do not apply. Toluca Lake owners should confirm which side of the city line their parcel sits on, because the same street can be in either city.

Burbank R-1 standards at a glance

StandardBurbank R-1 rule (Table 10-1-603)What it means for an addition
Floor area (FAR)0.4 × lot area up to 7,500 sq ft, plus 0.3 × lot area above 7,500 and 0.2 above 15,000A 6,000 sq ft lot allows 2,400 sq ft; 7,500 allows 3,000; 10,000 allows 3,750
Garage creditUp to 400 sq ft (front half), 500 sq ft (rear half) or 600 sq ft (alley access) excludedThe garage rarely eats into the house allowance
Lot coverage50%Ground-floor rooms are limited by footprint as well as floor area
Height20 ft top plate; 30 ft with a pitched roof, 23 ft flat roof; 2 storiesRoom for a second story with a sloped roof
Front setbackAverage of the block faceFront additions follow the street's pattern
Side setbacks10% of lot width, at least 3 ft and at most 10 ftAbout 5 ft on a 50 ft lot
Rear setback15 ftSets the depth of a rear addition

Two details catch owners by surprise. All enclosed structures count toward floor area, including an ADU, so a backyard unit and a room addition draw on the same allowance. And any part of a room with an interior height over 12 ft counts twice, which matters for vaulted family rooms. Open front porches of up to 250 sq ft are excluded. On a small lot that is already at the limit, the Planning Commission can allow up to 10 percent more floor area for a first-story addition, after a hearing with notice to neighbors within 300 ft.

The hillside area

Burbank's hillside rules apply to a mapped hillside area in the foothills rather than to a separate zone. There the allowed floor area drops to 0.35 on slopes of 15–29.99 percent and 0.30 on slopes of 30 percent or more, and a Hillside Development Permit is required when a project grades or expands a building pad, builds past the view setback lines, raises the roof above 16 ft or brings the total floor area over 3,000 sq ft. The Community Development Director decides it after mailed notice to owners and occupants within 300 ft, with appeal to the Planning Commission. Hillside heights are also capped at 30 ft above natural grade and lower near the street. Parts of the foothills lie in a Very High Fire Hazard Severity Zone, which brings ignition-resistant construction.

The Rancho (R-1-H)

The Rancho equestrian neighborhood is zoned R-1-H, single-family with horse-keeping. The site plan has to show the stables, corrals and the clearances that go with keeping horses, so a new room is placed around them from the start.

Plan check, step by step

  • Lot check. Zone, hillside area, lot area and existing floor area, which set the allowance.
  • Design and engineering. Drawings, structural calculations, Title 24 energy compliance and, on hillside lots, a soils report.
  • Submittal and corrections at Burbank Building & Safety, plus the Hillside Development Permit where required.
  • School fee receipt from Burbank Unified for additions over 500 sq ft, then issuance and inspections from foundation to final.

Remodel or addition: which permits apply in Burbank?

The path depends on whether floor area is added. A kitchen or bath rebuilt inside the existing walls needs electrical, plumbing and sometimes building permits, without a zoning review of floor area. Enclosing a patio, adding a room or a second floor adds floor area, and turning a garage into living space changes how existing floor area and parking are counted, so all of them go through full plan check: zoning, structure and energy. A garage converted into a separate dwelling with its own kitchen is an ADU and follows state ADU law instead.

Fees on a Burbank addition permit

Plan-check fees are paid when the plans are submitted and permit fees when the permit is issued; both are calculated by Burbank Building & Safety from the valuation of the work, so a bigger or more complex addition costs more to permit. School fees go to Burbank Unified and apply only when the addition adds more than 500 sq ft of assessable space, under Education Code §17620; a smaller addition is exempt. A hillside lot may add a soils or geology report and its review, and some parcels need a survey. On our projects every one of these is listed inside the fixed price, so the permit stage never becomes a separate bill.

After final inspection the County Assessor values the new square footage as new construction and adds it to the existing assessed value; the original house keeps its Proposition 13 base.

Owner-builder or licensed contractor in Burbank?

A homeowner can pull an addition permit as an owner-builder under Business and Professions Code §7044, but then takes on the duties of a contractor on that job: responsibility for workers, for the sequence of inspections and for the work passing them. With a licensed contractor those duties, the plan-check corrections and the closed permit at the end are in the contract, the deposit is capped at $1,000 or 10 percent of the price, and the license can be checked at cslb.ca.gov before you sign.

Whichever route you take, keep the approved plans and the finaled permit record with the house papers. Appraisers, insurers and the next buyer will ask for them, and they are the proof that the new square footage is legal.

Comparing quotes for a Burbank addition

  • Same scope. Square footage, room count, bathroom fixtures and the exterior match written out line by line.
  • Design and engineering. Included in the price, or a separate contract you sign first.
  • Permit and inspections. Plan-check fees, permit fees, school fees and the soils report, inside or outside the number.
  • Allowances. Tile, cabinets and fixtures named and priced, or left as allowances that grow later.
  • Payments. A deposit within the legal cap and progress payments tied to completed stages.
  • License. A license number you can check at cslb.ca.gov, in the contractor's own name.

A bid far below the others usually leaves out engineering, the permit, the service upgrade or the exterior match, and those come back as change orders.

What to have ready for a Burbank estimate

  • The address, so the parcel can be checked before the visit.
  • Any existing plans, permits or a survey of the property.
  • A rough idea of the room you want and where it should go.
  • Notes on earlier additions or enclosed porches, especially any built without permits.
  • Your timing: a move-in date or a season to avoid, so plan check and construction can be scheduled around it.

With those in hand the visit takes about an hour: we walk the house and the lot, open the electrical panel, look at the foundation and the roof framing where we can reach them, and talk through two or three ways to place the new room. The written recommendation and fixed price follow within a few business days, with the permit path for your parcel spelled out.

How we price a room addition in Burbank

One fixed, written price after a free on-site visit: we check the parcel, measure the house, look at the panel, the plumbing and the foundation, and itemize the design, engineering, permits, inspections and construction. Hidden conditions are priced in writing before the crew continues, the final payment follows your walkthrough, and a California home-improvement deposit is capped at $1,000 or 10 percent of the price, whichever is less. To start, see our room addition contractor page for Burbank.

Sources (checked November 2026): City of Burbank Community Development Department, Building & Safety Division, 150 N. Third Street; Burbank Municipal Code Title 10, Chapter 1, Article 6: R-1 and R-1-H zones (§10-1-601), development standards Table 10-1-603 (floor area, height, setbacks, second-story stepbacks), hillside area and Hillside Development Permit (§§10-1-606, 10-1-607); City of Burbank, School Facilities Fee information form (Burbank Unified School District receipt required before permit issuance); Burbank Fire Department, Fire Hazard Reduction Program (Very High Fire Hazard Severity Zone map, updated March 24, 2025); Education Code §17620 and the LAUSD Impact Fee Office: school fees on residential construction; additions of 500 sq ft or less of assessable space are exempt; Civil Code §1102.6, Real Estate Transfer Disclosure Statement: the seller answers whether room additions or alterations were made without necessary permits; Business and Professions Code §7044 (owner-builder permits) and §7159 (home-improvement contracts: down payment capped at $1,000 or 10 percent, whichever is less); Right Image Builders service and neighborhood pages (2026 planning ranges, timelines, permit authorities). Cost figures are Right Image Builders' 2026 planning ranges from its service and neighborhood pages.

FAQ

Frequently Asked
Questions

The City of Burbank Building & Safety Division, at the Community Services Building on North Third Street. Burbank is a separate city, so LADBS has no role, and Burbank Water and Power handles any electrical service upgrade.

The floor-area ratio is 0.4 on the first 7,500 sq ft of lot area and 0.3 above that, so a 6,000 sq ft lot allows 2,400 sq ft and a 7,500 sq ft lot 3,000 sq ft, with part of the garage excluded.

Yes. Burbank counts all enclosed structures, ADUs included, toward floor area, so a backyard unit and a room addition share the same limit on the lot.

In the mapped hillside area, when the project grades or enlarges a pad, builds past the view setback lines, raises the roof over 16 ft or brings the house over 3,000 sq ft of floor area.

The front setback follows the average of the block, the rear is 15 ft and each interior side is 10 percent of the lot width, between 3 and 10 ft.

Before the permit is issued. For additions over 500 sq ft of assessable space, Burbank Unified collects the fee and the city needs the district's receipt to release the permit.

Planning a Project?

Check What Your
Burbank Lot Allows

Free on-site estimate anywhere in Burbank: we pull your parcel, look at the structure and the yard, and give you a written recommendation and a fixed price before any design work.

(818) 210-4544
✓
Request Received
Thank you — a senior member of our team will reach out within 4 business hours. For anything urgent, call (818) 210-4544.

Your information is kept private and never shared. Privacy Policy

By submitting, you agree that Right Image Builders may contact you by phone, text or email about your project, including by automated means. Consent is not a condition of purchase. Message and data rates may apply. See our Privacy Policy and SMS Terms.